Drilling Operations Team
To plan and implement a safe, professional and cost effective scientific
drilling and core recovery operation utilizing sound drilling practices and principles to achieve the goals and objectives of the scientific community.
- To ensure all legs are executed in a safe manner and achieve the scientific objectives of the cruise.
- To ensure all legs are planned utilizing a standardized methodology for improved operational and engineering reference.
- To ensure equipment to achieve the scientific objectives of each leg is optimized for operational efficiencies and cost and is requisitioned on time for delivery to the port call.
|