
Figure F6. View of fantail of Aranda with the umbilical power cable leading to the British Geological Survey's (BGS) Rockdrill positioned on the seafloor. An iceberg looms in the background, but its presence did not terminate drilling. The rapid deployment and recovery of the BGS system, coupled with greater maneuverability when using a seabed drilling platform with umbilical cable, is ideal for the drilling conditions encountered on the East Greenland shelf.

