Table 2. Time, pressure, and volume measurements of PCS deployments at Site 994.
Core |
EST (h:m:s) |
Run time (min) |
Gauge pressure (psig) |
Corrected pressure (MPa) |
PCS opening number |
Gas released (mL) |
Gas sample number |
Gas split (mL) |
Cumulative volume (mL) |
Notes |
164-994C-27P | ||||||||||
10:00:00 |
0 |
Core recovery |
||||||||
10:11:00 |
11 |
3657 |
No ice; connect to inner port |
|||||||
10:15:00 |
15 |
3664 |
||||||||
10:16:00 |
16 |
423 |
C0 |
G1 |
||||||
10:20:00 |
20 |
444 |
||||||||
10:26:00 |
26 |
312 |
C1 |
(G2) |
||||||
10:27:00 |
27 |
332 |
||||||||
10:34:00 |
34 |
91 |
C2 |
(G2) |
||||||
10:38:00 |
38 |
111 |
Note: EST = eastern standard time.
This is a sample of the table that appears in the ASCII Tables directory.