Table 4. Time, pressure, and volume measurements of PCS deployments at Site 996.
Core |
EST (h:m:s) |
Run time (min) |
Gauge pressure (psig) |
Corrected pressure (MPa) |
PCS opening number |
Gas released (mL) |
Gas sample number |
Gas split (mL) |
Cumulative volume (mL) |
Notes |
164-996A-7P | ||||||||||
14:15:00 |
0 |
0 |
Core recovery |
|||||||
14:35:00 |
20 |
3326 |
23.01 |
0 |
On ice at 14:35:00; connect to inner port |
|||||
0:32:00 |
617 |
2529 |
17.52 |
0 |
||||||
0:38:00 |
623 |
2528 |
17.51 |
0 |
||||||
0:39:00 |
624 |
2049 |
14.21 |
C0 |
10 |
G1 |
10 |
10 |
||
0:40:00 |
625 |
2061 |
14.3 |
10 |
||||||
0:53:00 |
638 |
2063 |
14.31 |
10 |
||||||
0:55:00 |
640 |
2036 |
14.12 |
C1A |
10 |
|||||
0:56:00 |
641 |
1175 |
8.19 |
C1B |
20 |
G2 |
20 |
30 |
Note: EST = eastern standard time.
This is a sample of the table that appears in the ASCII Tables directory.