Figure 4. Process for making the compaction and the sedimentation rates uniform through the Hole 1002C succession. A. Actual drilled series (S1) with 18 cores (Cores 165-1002C-1H through 18H; average length: 9.45 m). B. Transformed series (S2) after a compaction correction, with 20 cores (19 with the standard length of 9.45 m). C. Transformed series (S3) with 21 cores (20 with the standard length of 9.45 m) after a sedimentation rate correction.