HOLE 1075C
-
Position: 4°47.1206'S, 10°4.5100'E
-
Start hole: 1810 hr, 25 August 1997
-
End hole: 1800 hr, 26 August 1997
-
Time on hole: 23.83 hr
-
Seafloor (drill pipe measurement from rig floor, mbrf): 3006.8
-
Total depth (drill pipe measurement from rig floor, mbrf): 3214
-
Distance between rig floor and sea level (m): 11.3
-
Water depth (drill pipe measurement from sea level, m): 2995.5
-
Penetration (mbsf): 207.2
-
Coring totals:
-
Type: APC
-
Number: 22
-
Cored: 207.2 m
-
Recovered: 213.47 m (103.03%)
-
Lithology:
Unit I: Greenish gray to olive-gray nannofossil-bearing diatomaceous clay and diatomaceous clay
