Table 9. List of splice tie points used to create the continuous "spliced" stratigraphic sequence for Site 1075.
Hole, core, section,
interval (cm)
Depth
(mbsf)
Composite depth
(mcd)
Whether
tied
Hole, core, section,
interval (cm)
Depth
(mbsf)
Composite depth
(mcd)
Offset
(m)
1075C-1H-5, 40 6.40 6.40 Tie to 1075B-2H-1, 116 6.16 6.40 0.24
1075B-2H-4, 138 10.88 11.12 Tie to 1075A-3H-1, 14 11.14 11.12 -0.02
1075A-3H-7, 10 20.10 20.08 Tie to 1075C-3H-2, 120 19.90 20.08 0.18
1075C-3H-6, 132 26.02 26.20 Tie to 1075A-4H-3, 144 24.94 26.20 1.26
1075A-4H-6, 120 29.20 30.46 Tie to 1075B-4H-5, 104 31.04 30.46 -0.58
1075B-4H-7, 16 33.16 32.58 Tie to 1075A-5H-2, 40 31.90 32.58 0.68
1075A-5H-6, 110 38.60 39.28 Tie to 1075B-5H-5, 5 39.56 39.28 -0.28
1075B-5H-6, 32 41.32 41.04 Tie to 1075A-6H-1, 44 39.94 41.04 1.10
1075A-6H-5, 122 46.72 47.82 Tie to 1075C-6H-1, 10.5 45.81 47.82 2.01
1075C-6H-7, 76 55.46 57.47 Tie to 1075B-7H-4, 20 57.20 57.47 0.27
1075B-7H-6, 100 61.00 61.27 Tie to 1075C-7H-2, 144 58.14 61.27 3.13
1075C-7H-6, 32 63.02 66.15 Tie to 1075B-8H-3, 23.5 65.25 66.15 0.90
1075B-8H-5, 100 69.00 69.90 Tie to 1075C-8H-2, 18.5 66.39 69.90 3.51
1075C-8H-6, 84 73.04 76.55 Tie to 1075A-9H-3, 40.5 71.41 76.55 5.14
1075A-9H-6, 28 75.86 81.00 Tie to 1075C-9H-1, 44 74.64 81.00 6.36
1075C-9H-7, 32 83.52 89.88 Tie to 1075B-10H-2, 99.5 83.51 89.88 6.37
1075B-10H-6, 104 89.54 95.91 Tie to 1075C-10H-4, 4 88.24 95.91 7.67
1075C-10H-7, 68 93.38 101.05 Tie to 1075A-11H-5, 106 93.56 101.05 7.49
1075A-11H-7, 84 96.22 103.71 Tie to 1075C-11H-2, 112 95.82 103.71 7.89
1075C-11H-6, 24 100.94 108.83 Tie to 1075B-12H-1, 20 100.20 108.83 8.63
1075B-12H-6, 144 108.92 117.55 Tie to 1075A-13H-1, 50 106.50 117.55 11.05
1075A-13H-5, 142 113.42 124.47 Tie to 1075C-13H-1, 80 113.00 124.47 11.47
1075C-13H-7, 32 121.52 132.99 Tie to 1075B-14H-3, 36 122.36 132.99 10.63
1075B-14H-7, 44 128.44 139.07 Tie to 1075B-14H-4, 100 127.18 139.07 11.89
1075C-14H-6, 144 130.62 142.51 Tie to 1075A-15H-4, 126 129.44 142.51 13.07
1075A-15H-8, 70 134.68 147.75 Tie to 1075C-15H-2, 108 133.78 147.75 13.97
1075C-15H-4, 116 136.86 150.83 Tie to 1075A-16H-1, 146 135.96 150.83 14.87
1075A-16H-6, 144 143.44 158.31 Tie to 1075C-16H-3, 20 143.90 158.31 14.41
1075C-16H-7, 4 149.74 164.15 Tie to 1075A-17H-4, 66 149.16 164.15 14.99
1075A-17H-6, 132 152.82 167.81 Tie to 1075B-17H-5, 116 153.50 167.81 14.31
1075B-17H-8, 32 157.16 171.47 Tie to 1075A-18H-1, 144 154.94 171.47 16.53
1075A-18H-6, 134 162.07 178.60 Tie to 1075B-18H-4, 84 161.62 178.60 16.98
1075B-18H-7, 56 165.84 182.82 Tie to 1075A-19H-1, 52 163.52 182.82 19.30
1075A-19H-7, 22 172.22 191.52 Tie to 1075B-19H-4, 88 171.88 191.52 19.64
1075B-19H-7, 56 176.06 195.70 Tie to 1075A-20H-3, 28 174.69 195.70 21.01
1075A-20H-8, 34 182.22 203.23 Tie to 1075B-20H-5, 24 181.27 203.23 21.96
1075B-20H-8, 28 185.81 207.77 Tie to 1075A-21H-3, 64 185.64 207.77 22.13
1075A-21H-6, 42 189.92 212.05 Tie to 1075B-21H-3, 44 188.04 212.05 24.01
1075B-21H-7, 132 194.92 218.93 Tie to 1075A-22H-2, 106 194.06 218.93 24.87
1075A-22H-6, 132 200.32 225.19 Tie to 1075B-22H-3, 64 198.64 225.19 26.55
1075B-22H-5, 112 202.12 228.67 Tie to 1075C-22H-4, 128 202.17 228.67 26.50
1075C-22H-8, 84 207.73 234.23




Note: The tie points are listed in standard ODP meters below seafloor (mbsf) and meters composite depth (mcd).