Table 9. List of splice tie points used to create the continuous "spliced" stratigraphic sequence for Site 1077.
Hole, core, section,
interval (cm)
Depth
(mbsf)
Composite depth
(mcd)
Whether
tied
Hole, core, section,
interval (cm)
Depth
(mbsf)
Composite depth
(mcd)
Offset
(m)
1077B-1H-4, 92 5.42 5.42 Tie to 1077B-2H-1, 0 5.60 5.60 0.00
1077B-2H-6, 84 13.94 13.94 Tie to 1077A-3H-1, 0 14.50 14.94 0.44
1077A-3H-6, 38 22.38 22.82 Tie to 1077B-3H-5, 92 22.02 22.82 0.80
1077B-3H-6, 118 23.78 24.58 Tie to 1077A-4H-1, 14 24.14 24.58 0.44
1077A-4H-6, 82 32.32 32.76 Tie to 1077B-4H-4, 86 29.96 32.76 2.80
1077B-4H-6, 28 32.38 35.18 Tie to 1077A-5H-1, 124 34.74 35.18 0.44
1077A-5H-5, 124 40.74 41.18 Tie to 1077B-5H-3, 42 37.52 41.18 3.66
1077B-5H-6, 148 43.08 46.74 Tie to 1077A-6H-1, 42 43.42 46.74 3.32
1077A-6H-6, 76 51.26 54.58 Tie to 1077B-6H-5, 132 50.92 54.58 3.66
1077B-6H-7, 54 53.14 56.80 Tie to 1077A-7H-1, 0 52.50 56.70 4.20
1077A-7H-7, 62 62.16 66.36 Tie to 1077A-8H-1, 16 62.16 66.36 4.20
1077A-8H-6, 72 70.22 74.42 Tie to 1077B-8H-4, 88 67.98 74.42 6.44
1077B-8H-7, 32 71.92 78.36 Tie to 1077A-9H-1, 148 72.98 78.36 5.38
1077A-9H-4, 138 77.38 82.76 Tie to 1077B-9H-3, 121 76.32 82.76 6.44
1077B-9H-7, 52 81.62 88.06 Tie to 1077A-10H-1, 68 81.68 88.06 6.38
1077A-10H-6, 60 88.50 94.88 Tie to 1077B-10H-5, 84 88.44 94.88 6.44
1077B-10H-7, 32 90.92 97.36 Tie to 1077A-11H-1, 48 90.98 97.36 6.38
1077A-11H-6, 112 98.92 105.30 Tie to 1077B-11H-5, 36 97.46 105.30 7.84
1077B-11H-6, 116 99.76 107.60 Tie to 1077A-12H-1, 88 100.88 107.60 6.72
1077A-12H-6, 36 107.86 114.58 Tie to 1077B-12H-4, 139 106.74 114.58 7.84
1077B-12H-6, 28 108.69 116.53 Tie to 1077A-13H-1, 30.5 109.81 116.53 6.72
1077A-13H-7, 52 119.02 125.74 Tie to 1077A-14H-1, 0 119.00 125.72 6.72
1077A-14H-5, 144 126.34 133.06 Tie to 1077B-14H-5, 2.5 124.22 133.06 8.84
1077B-14H-7, 84 127.97 136.81 Tie to 1077A-15H-1, 98.5 129.49 136.81 7.32
1077A-15H-4, 84 133.84 141.16 Tie to 1077B-15H-3, 21 132.32 141.16 8.84
1077B-15H-7, 36 138.06 146.90 Tie to 1077A-16H-1, 100 139.00 146.90 7.90
1077A-16H-5, 100 145.00 152.90 Tie to 1077B-16H-4, 96 144.06 152.90 8.84
1077B-16H-6, 124 147.34 156.18 Tie to 1077A-17H-1, 77 148.28 156.18 7.90
1077A-17H-3, 32 150.82 158.72 Tie to 1077B-17H-1, 101 149.12 158.72 9.60
1077B-17H-7, 24 157.34 166.94 Tie to 1077A-18H-1, 140 158.40 166.94 8.54
1077A-18H-4, 66 162.16 170.70 Tie to 1077B-18H-3, 49 161.10 170.70 9.60
1077B-18H-7, 52 167.12 176.72 Tie to 1077A-19H-1, 17 166.68 176.72 10.04
1077A-19H-6, 136 175.36 185.40 Tie to 1077B-19H-6, 64 175.24 185.40 10.16
1077B-19H-7, 64 176.74 186.90 Tie to 1077A-20H-1, 0 176.00 186.88 10.88
1077A-20H-5, 20 182.10 192.98 Tie to 1077B-20H-4, 48 181.58 192.98 11.40
1077B-20H-7, 56 186.16 197.56 Tie to 1077B-21H-1, 0 186.10 197.50 11.40
1077B-21H-6, 28 193.88 205.28 Tie to 1077A-21H-5, 116 192.66 205.28 12.62
1077A-21H-7, 64 195.14 207.76 Tie to 1077A-22H-1, 13 195.14 207.76 12.62
1077A-22H-3, 48 198.48 211.10 Tie to 1077B-22H-2, 113 198.24 211.10 12.86
1077B-22H-7, 64 205.24 218.10




Note: The tie points are listed in standard ODP meters below seafloor (mbsf) and meters composite depth (mcd).