HOLE 1081B
-
Position: 19°37.1981'S, 11°19.1588'E
-
Start hole: 2115 hr, 11 September 1997
-
End hole: 0925 hr, 12 September 1997
-
Time on hole: 12.17 hr
-
Seafloor (drill pipe measurement from rig floor, mbrf): 804.5
-
Total depth (drill pipe measurement from rig floor, mbrf): 992.1
-
Distance between rig floor and sea level (m): 11.4
-
Water depth (drill pipe measurement from sea level, m): 793.1
-
Penetration (mbsf): 187.6
-
Coring totals:
-
Type: APC
-
Number: 21
-
Cored: 187.6 m
-
Recovered: 195.87 m (104.41%)
-
Lithology:
-
Unit I: clay with varying amounts of diatoms, nannofossils, foraminifers, and radiolarians