Table 9. List of splice tie points used to create the continuous "spliced" stratigraphic sequence for Site 1081.
Hole, core, section,
interval (cm)
Depth
(mbsf)
Composite depth
(mcd)
Whether
tied
Hole, core, section,
interval (cm)
Depth
(mbsf)
Composite depth
(mcd)
Offset
(m)
1081C-1H-3, 20 3.20 3.32 Tie to 1081A-2H-1, 90.5 1.91 3.32 1.41
1081A-2H-4, 114 6.64 8.05 Tie to 1081B-2H-2, 118.5 7.69 8.05 0.36
1081B-2H-5, 88 11.88 12.24 Tie to 1081C-2H-3, 136 11.66 12.24 0.58
1081C-2H-5, 12 13.42 14.00 Tie to 1081A-3H-1, 70 11.20 14.00 2.80
1081A-3H-6, 78 18.68 21.48 Tie to 1081B-3H-4, 109 20.10 21.48 1.38
1081B-3H-7, 20 23.70 25.08 Tie to 1081A-4H-1, 50.5 20.51 25.08 4.57
1081A-4H-4, 16 24.56 29.13 Tie to 1081B-4H-2, 89 26.40 29.13 2.73
1081B-4H-7, 24 33.24 35.97 Tie to 1081A-5H-1, 120 30.70 35.97 5.27
1081A-5H-6, 144 38.34 43.61 Tie to 1081B-5H-5, 48 39.98 43.61 3.63
1081B-5H-7, 28 42.78 46.41 Tie to 1081A-6H-2, 34 40.84 46.41 5.57
1081A-6H-6, 108 47.48 53.05 Tie to 1081B-6H-4, 121 48.72 53.05 4.33
1081B-6H-6, 104 51.54 55.87 Tie to 1081A-7H-1, 42 48.92 55.87 6.95
1081A-7H-6, 62 56.52 63.47 Tie to 1081B-7H-4, 140 58.40 63.47 5.07
1081B-7H-6, 92 60.92 65.99 Tie to 1081A-8H-1, 112 59.12 65.99 6.87
1081A-8H-5, 92 64.82 71.69 Tie to 1081C-8H-1, 65 64.96 71.69 6.73
1081C-8H-6, 32 72.12 78.85 Tie to 1081A-9H-3, 36 70.86 78.85 7.99
1081A-9H-5, 78 74.18 82.17 Tie to 1081B-9H-3, 132 75.82 82.17 6.35
1081B-9H-6, 84 79.84 86.19 Tie to 1081C-9H-3, 100 77.80 86.19 8.39
1081C-9H-6, 40 81.70 90.09 Tie to 1081A-10H-3, 82 80.82 90.09 9.27
1081A-10H-5, 136 84.26 93.53 Tie to 1081C-10H-3, 16 86.46 93.53 7.07
1081C-10H-6, 120 92.00 99.07 Tie to 1081A-11H-3, 96 90.46 99.07 8.61
1081A-11H-6, 64 94.54 103.15 Tie to 1081B-11H-4, 72 95.72 103.15 7.43
1081B-11H-6, 144 99.44 106.87 Tie to 1081C-11H-4, 128 98.58 106.87 8.29
1081C-11H-5, 100 99.80 108.09 Tie to 1081A-12H-2, 110.5 98.61 108.09 9.48
1081A-12H-4, 96 101.36 110.84 Tie to 1081B-12H-2, 90.5 102.41 110.84 8.43
1081B-12H-7, 48 109.48 117.91 Tie to 1081A-13H-1, 75.5 106.27 117.91 11.64
1081A-13H-6, 100 114.05 125.69 Tie to 1081C-13H-3, 50.5 115.31 125.69 10.38
1081C-13H-5, 100 118.80 129.18 Tie to 1081A-14H-2, 17 116.68 129.18 12.50
1081A-14H-6, 68 123.18 135.68 Tie to 1081B-14H-5, 20 125.20 135.68 10.48
1081B-14H-6, 56 127.06 137.54 Tie to 1081A-15H-1, 49 125.00 137.54 12.54
1081A-15H-6, 128 133.34 145.88 Tie to 1081C-15H-3, 25 134.06 145.88 11.82
1081C-15H-5, 124 138.04 149.86 Tie to 1081B-16H-1, 25 138.26 149.86 11.60
1081B-16H-7, 60 147.67 159.27 Tie to 1081A-18H-1, 22.5 146.23 159.27 13.04
1081A-18H-5, 144 153.39 166.43 Tie to 1081B-17H-5, 131.5 154.83 166.43 11.60
1081B-17H-6, 144 156.44 168.04 Tie to 1081A-19X-1, 45 154.96 168.04 13.08
1081A-19X-5, 136 161.86 174.94 Tie to 1081B-18H-5, 33 163.34 174.94 11.60
1081B-18H-7, 8 166.08 177.68 Tie to 1081A-20X-1, 49 164.60 177.68 13.08
1081A-20X-5, 120 171.30 184.38 Tie to 1081B-19H-4, 85 171.86 184.38 12.52
1081B-19H-6, 56 174.56 187.08 Tie to 1081A-21X-1, 20 174.00 187.08 13.08
1081A-21X-4, 8 178.38 191.46 Tie to 1081B-20H-2, 144 178.94 191.46 12.52
1081B-20H-7, 20 185.2 197.72 Tie to 1081A-22X-1, 113 184.64 197.72 13.08
1081A-22X-7, 44 192.94 206.02 Tie to 1081A-23X-1, 0 193.1 206.18 13.08
1081A-23X-6, 92 201.52 214.60




Note: The tie points are listed in standard ODP meters below seafloor (mbsf) and meters composite depth (mcd).