10. SITE 10821

Shipboard Scientific Party2

HOLE 1082A

Position: 21°5.6373'S, 11°49.2361'E
Start hole: 0445 hr, 13 September 1997
End hole: 0005 hr, 16 September 1997
Time on hole: 67.33 hr
Seafloor (drill pipe measurement from rig floor, mbrf): 1290.7
Total depth (drill pipe measurement from rig floor, mbrf): 1891.3
Distance between rig floor and sea level (m): 11.4
Water depth (drill pipe measurement from sea level, m): 1279.3
Penetration (mbsf): 600.6
Coring totals:
    Type: APC
    Number: 14
    Cored: 128.60 m
    Recovered: 134.88 m (104.88%)
    Type: XCB
    Number: 50
    Cored: 472.0 m
    Recovered: 367.13 m (77.78%)
Lithology:
    Subunit IA: intercalated intervals of nannofossil- and foraminifer-rich clay
    Subunit IB: intercalated intervals of nannofossil- and diatom-rich clay and nannofossil-rich diatomaceous clay
    Subunit IC: intercalated intervals of nannofossil-rich clay and nannofossil clay
    Unit II: nannofossil ooze

1Examples of how to reference the whole or part of this volume can be found under "Citations" in the preliminary pages of the volume.
2Shipboard Scientific Party addresses can be found under "Shipboard Scientific Party" in the preliminary pages of the volume.

Ms 175IR-110
Reproduced online:
31 August 2007

NEXT