Shipboard Scientific Party2
HOLE 1084A
-
Position: 25°30.8345'S, 13°1.6668'E
-
Start hole: 0310 hr, 21 September 1997
-
End hole: 0315 hr, 24 September 1997
-
Time on hole: 72.08 hr
-
Seafloor (drill pipe measurement from rig floor, mbrf): 2003.5
-
Total depth (drill pipe measurement from rig floor, mbrf): 2608.5
-
Distance between rig floor and sea level (m): 11.6
-
Water depth (drill pipe measurement from sea level, m): 1991.9
-
Penetration (mbsf): 605
-
Coring totals:
-
Type: APC
-
Number: 17
-
Cored: 149.50 m
-
Recovered: 156.80 m (104.88%)
-
Type: XCB
-
Number: 48
-
Cored: 455.50 m
-
Recovered: 354.76 m (77.88%)
-
Lithology:
- Subunit IA: foraminifer- and diatom-bearing nannofossil clay and foraminifer-bearing diatom-rich clayey nannofossil ooze
-
Subunit IB: nannofossil-rich diatomaceous clay, clayey nannofossil ooze, and diatom-bearing clay
-
Subunit IC: nannofossil-rich diatomaceous clay and nannofossil diatomaceous clay
-
Unit II: clay-rich nannofossil diatom ooze, diatomaceous nannofossil ooze, and clay-rich nannofossil ooze
-
Unit III: clay, nannofossil clay, and diatom-bearing nannofossil clay
-
Unit IV: clayey nannofossil ooze, diatom-bearing clayey nannofossil ooze, and diatom-rich clayey nannofossil ooze
1Examples of how to reference the whole or
part of this volume can be found under
"Citations" in the preliminary pages of
the volume.
2Shipboard
Scientific Party addresses can be found under
"Shipboard Scientific Party" in
the preliminary pages of the volume.
Ms
175IR-112
Reproduced online:
31 August 2007
