Table 9. List of splice tie points used to create the continuous "spliced" stratigraphic sequence for Site 1085.
Hole, core, section,
interval (cm)
Depth
(mbsf)
Composite depth
(mcd)
Whether
tied
Hole, core, section,
interval (cm)
Depth
(mbsf)
Composite depth
(mcd)
Offset
(m)
1085B-1H-5, 56 6.56 6.56
Tie to
1085A-2H-1, 116.5 4.87 6.56 1.69
1085A-2H-5, 78 10.48 12.17
Tie to
1085B-2H-2, 81 10.22 12.17 1.95
1085B-2H-6, 140 16.80 18.75
Tie to
1085A-3H-2, 94 15.64 18.75 3.11
1085A-3H-6, 38 21.08 24.19
Tie to
1085B-3H-3, 96 21.36 24.19 2.83
1085B-3H-6, 44 25.34 28.17
Tie to
1085A-4H-2, 36 24.56 28.17 3.61
1085A-4H-5, 6 28.76 32.37
Tie to
1085B-4H-2, 9 28.50 32.37 3.87
1085B-4H-6, 72 35.12 38.99
Tie to
1085A-5H-1, 110 33.30 38.99 5.69
1085A-5H-6, 6 39.76 45.45
Tie to
1085B-5H-3, 133 40.74 45.45 4.71
1085B-5H-7, 4 45.44 50.15
Tie to
1085A-6H-3, 18 44.88 50.15 5.27
1085A-6H-4, 134 47.54 52.81
Tie to
1085B-6H-2, 5 47.46 52.81 5.35
1085B-6H-7, 4 54.94 60.29
Tie to
1085A-7H-2, 8 52.78 60.29 7.51
1085A-7H-5, 112 58.32 65.83
Tie to
1085B-7H-3, 145 59.85 65.83 5.98
1085B-7H-6, 36 63.26 69.24
Tie to
1085A-8H-2, 8 62.28 69.24 6.96
1085A-8H-4, 116 66.36 73.32
Tie to
1085B-8H-2, 33 66.74 73.32 6.58
1085B-8H-5, 100 71.90 78.48
Tie to
1085A-9H-1, 44 70.64 78.48 7.84
1085A-9H-6, 16 77.86 85.70
Tie to
1085B-9H-2, 141 77.32 85.70 8.38
1085B-9H-7, 40 83.80 92.18
Tie to
1085A-10H-3, 36 83.06 92.18 9.12
1085A-10H-4, 120 85.40 94.52
Tie to
1085B-10H-2, 1 85.42 94.52 9.10
1085B-10H-6, 32 91.72 100.82
Tie to
1085A-11H-2, 12 90.82 100.82 10.00
1085A-11H-6, 24 96.94 106.94
Tie to
1085B-11H-3, 72 97.12 106.94 9.82
1085B-11H-6, 4 100.94 110.76
Tie to
1085A-12H-1, 129 100.00 110.76 10.76
1085A-12H-5, 84 105.54 116.30
Tie to
1085B-12H-2, 144 105.84 116.30 10.46
1085B-12H-6, 100 111.40 121.86
Tie to
1085A-13H-2, 68 110.38 121.86 11.48
1085A-13H-5, 24 114.44 125.92
Tie to
1085B-13H-2, 49 114.40 125.92 11.52
1085B-13H-6, 96 120.86 132.38
Tie to
1085A-14H-1, 128 118.98 132.38 13.40
1085A-14H-5, 4 123.74 137.14
Tie to
1085B-14H-2, 104 124.44 137.14 12.70
1085B-14H-7, 8 130.98 143.68
Tie to
1085A-15H-2, 5 128.78 143.68 14.90
1085A-15H-6, 144 136.16 151.06
Tie to
1085B-15H-5, 17 137.58 151.06 13.48
1085B-15H-6, 16 139.06 152.54
Tie to
1085A-16H-1, 93 137.64 152.54 14.90
1085A-16H-3, 136 141.06 155.96
Tie to
1085B-16H-1, 112 142.02 155.96 13.94
1085B-16H-7, 76 149.25 163.19
Tie to
1085A-17H-2, 28 146.70 163.19 16.49
1085A-17H-7, 120 155.12 171.61
Tie to
1085B-17H-4, 57 155.48 171.61 16.13
1085B-17H-5, 40 156.80 172.93
Tie to
1085A-18H-1, 136 157.06 172.93 15.87
1085A-18H-6, 76 163.96 179.83
Tie to
1085B-18H-3, 112 164.02 179.83 15.81
1085B-18H-5, 68 166.58 182.39
Tie to
1085A-19H-2, 16 166.86 182.39 15.53
1085A-19H-5, 120 172.40 187.93
Tie to
1085B-19H-3, 65 173.06 187.93 14.87
1085B-19H-5, 20 175.60 190.47
Tie to
1085A-20H-1, 108 175.78 190.47 14.69
1085A-20H-5, 104 181.74 196.43
Tie to
1085B-20H-3, 146 183.36 196.43 13.07
1085B-20H-6, 56 186.96 200.03
Tie to
1085A-21H-1, 60 184.80 200.03 15.23
1085A-21H-6, 80 192.50 207.73
Tie to
1085B-21H-4, 4 192.94 207.73 14.79
1085B-21H-6, 116 197.06 211.85
Tie to
1085A-22H-1, 144 195.14 211.85 16.71
1085A-22H-6, 56 201.76 218.47
Tie to
1085B-22H-3, 133 202.24 218.47 16.23
1085B-22H-6, 60 206.00 222.23
Tie to
1085A-23H-1, 70.1 203.92 222.23 18.31
1085A-23H-6, 88 211.58 229.89
Tie to
1085B-23H-4, 16.9 212.08 229.89 17.81
1085B-23H-6, 16 215.06 232.87
Tie to
1085A-24H-2, 4 214.24 232.87 18.63
1085A-24H-5, 76 219.63 238.26
Tie to
1085B-24H-2, 64 219.04 238.26 19.22
1085B-24H-6, 48 224.88 244.10
Tie to
1085A-25H-2, 5 223.76 244.10 20.34
1085A-25H-6, 32 230.02 250.36
Tie to
1085B-25H-3, 20 229.60 250.36 20.76
1085B-25H-6, 84 234.74 255.50
Tie to
1085A-26H-2, 32 233.52 255.50 21.98
1085A-26H-7, 4 239.34 261.32
Tie to
1085B-26H-2, 72 238.12 261.32 23.2
1085B-26H-6, 56 243.96 267.16
Tie to
1085A-27H-2, 76 243.46 267.16 23.7
1085A-27H-6, 28 248.98 272.68
Tie to
1085B-27H-2, 96 247.86 272.68 24.82
1085B-27H-5, 80 252.22 277.02
Tie to
1085A-28H-1, 64 251.34 277.02 25.68
1085A-28H-6, 68 258.88 284.56
Tie to
1085B-28H-3, 60 258.50 284.56 26.06
1085B-28H-4, 140 260.80 286.86
Tie to
1085A-29H-1, 0 260.20 286.86 26.66
1085A-29H-4, 80 265.50 292.16
Tie to
1085B-29H-3, 92 264.82 292.16 27.34
1085B-29H-7, 84 270.74 298.08


     

Note: The tie points are listed in standard ODP meters below seafloor (mbsf) and meters composite depth (mcd).