Figure 3. Seismic Line GeoB/AWI 96-003. Sites 1086 and 1087 are projected onto the profile (dashed lines). Vertical axis is given in TWT. CDP interval is 25 m for a shotpoint spacing of 25 m. Seismic data is 24-fold stacked and not migrated.