HOLE 1087C

Position: 31°27.9137'S, 15°18.6541'E
Start hole: 0340 hr, 4 October 1997
End hole: 0705 hr, 6 October 1997
Time on hole: 51.42 hr
Seafloor (drill pipe measurement from rig floor, mbrf): 1385.9
Total depth (drill pipe measurement from rig floor, mbrf): 1877.8
Distance between rig floor and sea level (m): 11.7
Water depth (drill pipe measurement from sea level, m): 1374.2
Penetration (mbsf): 491.9
Coring totals:
    Type: APC
    Number: 27
    Cored: 248.60 m
    Recovered: 255.01 m (102.58%)
    Type: XCB
    Number: 26
    Cored: 243.30 m
    Recovered: 223.29 m (91.78%)
Lithology:
    Unit I: foraminifer-nannofossil ooze, foraminifer-rich nannofossil ooze, foraminifer-bearing nannofossil ooze, and nannofossil ooze
    Unit II: foraminifer-bearing and foraminifer-rich nannofossil ooze