Table 9. List of splice tie points used to create the continuous "spliced" stratigraphic sequence for Site 1087.
Hole, core, section,
interval (cm)
Depth
(mbsf)
Composite depth
(mcd)
Whether
tied
Hole, core, section,
interval (cm)
Depth
(mbsf)
Composite depth
(mcd)
Offset
(m)
1087A-1H-4, 78 5.28 5.28
Tie to
1087C-2H-2, 32 3.46 5.28 1.82
1087C-2H-5, 54 8.14 9.96
Tie to
1087A-2H-1, 39 8.59 9.96 1.37
1087A-2H-7, 34 17.54 18.91
Tie to
1087B-3H-2, 136.5 18.39 18.91 0.52
1087B-3H-4, 104 21.04 21.56
Tie to
1087A-3H-2, 39 19.59 21.56 1.97
1087A-3H-6, 44 25.54 27.51
Tie to
1087C-4H-3, 66.5 24.29 27.51 3.22
1087C-4H-6, 4 28.14 31.36
Tie to
1087A-4H-1, 124 28.44 31.36 2.92
1087A-4H-5, 124 34.44 37.36
Tie to
1087C-5H-3, 2 33.16 37.36 4.20
1087C-5H-6, 134 38.94 43.14
Tie to
1087A-5H-1, 94 37.64 43.14 5.50
1087A-5H-6, 69 44.89 50.39
Tie to
1087C-6H-4, 106.5 45.19 50.39 5.20
1087C-6H-6, 84 47.94 53.14
Tie to
1087A-6H-1, 74 46.94 53.14 6.20
1087A-6H-5, 139 53.59 59.79
Tie to
1087C-7H-3, 106.5 53.19 59.79 6.60
1087C-7H-6, 74 57.34 63.94
Tie to
1087A-7H-1, 89 56.59 63.94 7.35
1087A-7H-6, 4 63.24 70.59
Tie to
1087C-8H-3, 144 63.04 70.59 7.55
1087C-8H-6, 14 66.24 73.79
Tie to
1087B-8H-4, 74 68.24 73.79 5.55
1087B-8H-7, 24 72.24 77.79
Tie to
1087C-9H-1, 74 68.84 77.79 8.95
1087C-9H-7, 4 77.14 86.09
Tie to
1087A-9H-2, 4 76.24 86.09 9.85
1087A-9H-6, 34 82.54 92.39
Tie to
1087C-10H-3, 144 82.04 92.39 10.35
1087C-10H-6, 44 85.54 95.89
Tie to
1087A-10H-1, 84 85.04 95.89 10.85
1087A-10H-5, 134 91.54 102.39
Tie to
1087C-11H-3, 64 90.74 102.39 11.65
1087C-11H-6, 114 95.74 107.39
Tie to
1087A-11H-2, 64 95.84 107.39 11.55
1087A-11H-5, 84 100.54 112.09
Tie to
1087C-12H-2, 104 99.14 112.09 12.95
1087C-12H-6, 54 104.64 117.59
Tie to
1087A-12H-2, 24 104.94 117.59 12.65
1087A-12H-5, 44 109.64 122.29
Tie to
1087C-13H-2, 4 107.64 122.29 14.65
1087C-13H-6, 64 114.24 128.89
Tie to
1087A-13H-2, 34 114.54 128.89 14.35
1087A-13H-6, 64 120.84 135.19
Tie to
1087C-14H-4, 4 120.14 135.19 15.05
1087C-14H-6, 14 123.24 138.29
Tie to
1087A-14H-1, 114 123.34 138.29 14.95
1087A-14H-4, 94 127.64 142.59
Tie to
1087C-15H-2, 4 126.64 142.59 15.95
1087C-15H-6, 14 132.74 148.69
Tie to
1087A-15H-1, 144 133.14 148.69 15.55
1087A-15H-7, 14 140.84 156.39
Tie to
1087C-16H-4, 134 140.44 156.39 15.95
1087C-16H-6, 144 143.54 159.49
Tie to
1087A-16H-2, 24 142.94 159.49 16.55
1087A-16H-6, 74 149.44 165.99
Tie to
1087C-17H-3, 145 148.55 165.99 17.44
1087C-17H-6, 124 152.84 170.28
Tie to
1087A-17H-1, 54 151.24 170.28 19.04
1087A-17H-6, 34 158.54 177.58
Tie to
1087C-18H-4, 104 159.05 177.58 18.53
1087C-18H-6, 114 162.15 180.68
Tie to
1087A-18H-1, 52.5 160.73 180.68 19.95
1087A-18H-5, 124 167.44 187.39
Tie to
1087C-19H-1, 104 164.14 187.39 23.25
1087C-19H-7, 44 172.54 195.79
Tie to
1087A-19H-1, 24 169.94 195.79 25.85
1087A-19H-7, 64 179.34 205.19
Tie to
1087C-21H-1, 0 182.10 205.25 23.15
1087C-21H-6, 124 190.84 213.99


     

Note: The tie points are listed in standard ODP meters below seafloor (mbsf) and meters composite depth (mcd).