Press to Close

Figure F10. Schematic diagram of the wireline logging tool strings deployed during Leg 176. (1) Modified triple combo string deployed at the end of the cruise; (2) FMS/DSI combination; (3) resistivity (DLL) and general purpose inclinometry tool (GPIT) combination; and (4) VSP tool.

Press to Close