Table T29. Summary of logging operations at Site 1096.

Task Start time

Hole preparation

22:50, 3 March 1998

IPLT, upper part of hole

00:30, 4 March 1998

Hole preparation

11:40, 4 March 1998

IPLT, lower part of hole

15:30, 4 March 1998

GHMT, lower part of hole

23:10, 4 March 1998

End of logging operations

09:30, 5 March 1998

Note: IPLT = integrated porosity-lithology tool, GHMT = geological high-sensitivity magnetic tool.