Table T29. Summary of logging operations at Site 1096.
Task | Start time |
---|---|
Hole preparation |
22:50, 3 March 1998 |
IPLT, upper part of hole |
00:30, 4 March 1998 |
Hole preparation |
11:40, 4 March 1998 |
IPLT, lower part of hole |
15:30, 4 March 1998 |
GHMT, lower part of hole |
23:10, 4 March 1998 |
End of logging operations |
09:30, 5 March 1998 |
Note: IPLT = integrated porosity-lithology tool, GHMT = geological high-sensitivity magnetic tool.