Figure F2.
Comparison of the two passes of the GHMT over 80-m sections in Holes 1095B and 1096C. Notice the greater repeatability and near absence of spikes in Hole 1096C compared with Hole 1095B. Solid lines = Pass 1, dashed lines = Pass 2.