Table T2
(continued). (Continued on next page.)
Core
Date (1998)
Time
(UTC
+10 hr)
Core depth (mbsf)Length (m)
Recovery (%)
Section
Length (m)
Section depth (mbsf)
Catwalk samples
Comment
Top
Bottom
Cored
Recovered
Liner
Curated
Top
Bottom
3H
24 June
2045
16.9
26.4
9.5
9.87
103.9
Adara
1
1.50
1.50
16.90
18.40
2
1.50
1.50
18.40
19.90
HS, WEL, WROG, WRMB, IW
3
1.50
1.50
19.90
21.40
4
1.50
1.50
21.40
22.90
5
1.50
1.50
22.90
24.40
6
1.50
1.50
24.40
25.90
7
0.68
0.68
25.90
26.58
CC
0.19
0.19
26.58
26.77
PAL
9.87
9.87
4H
24 June
2130
26.4
35.9
9.5
10.05
105.8
1
1.50
1.50
26.40
27.90
2
1.50
1.50
27.90
29.40
HS, IW
3
1.50
1.50
29.40
30.90
WEL
4
1.50
1.50
30.90
32.40
5
1.50
1.50
32.40
33.90
6
1.50
1.50
33.90
35.40
7
0.74
0.74
35.40
36.14
CC
0.31
0.31
36.14
36.45
PAL
10.05
10.05
5H
24 June
2235
35.9
45.4
9.5
10.32
108.6
Adara
1
1.50
1.50
35.90
37.40
2
1.50
1.50
37.40
38.90
3
1.50
1.50
38.90
40.40
HS, IW
4
1.50
1.50
40.40
41.90
WEL
5
1.50
1.50
41.90
43.40
6
1.50
1.50
43.40
44.90
7
0.84
0.84
44.90
45.74
CC
0.48
0.48
45.74
46.22
PAL
10.32
10.32
6H
24 June
2305
45.4
54.9
9.5
10.12
106.5
1
1.50
1.50
45.40
46.90
2
1.50
1.50
46.90
48.40
3
1.50
1.50
48.40
49.90
HS, IW
4
1.50
1.50
49.90
51.40
WEL
5
1.50
1.50
51.40
52.90
6
1.50
1.50
52.90
54.40
7
0.83
0.83
54.40
55.23
CC
0.29
0.29
55.23
55.52
PAL
10.12
10.12
7H
25 June
0010
54.9
64.4
9.5
10.11
106.4
Adara
1
1.50
1.50
54.90
56.40
2
1.50
1.50
56.40
57.90
3
1.50
1.50
57.90
59.40
IW
4
1.50
1.50
59.40
60.90
HS, WEL
5
1.50
1.50
60.90
62.40
6
1.50
1.50
62.40
63.90
7
0.69
0.69
63.90
64.59
CC
0.42
0.42
64.59
65.01
PAL
10.11
10.11