Table T15.
Summary of logging operations, Hole 1115C.
Logging
Mudline
depth (mbrf)
Pipe
depth (mbsf)
Logged
interval (mbsf)
Run
Tool
string
Pass
Drill
pipe
Wireline
Drill
pipe
Wireline
Bottom
Top
1
Triple combo
Down
1160.3
99.7
102.0
1
Triple combo
Up
1160.3
1161.0
79.7
79.2
784.2
-38.4
2
FMS-sonic
Up 1
1160.3
99.7
787.0
726.0
2
FMS-sonic
Up 2
1160.3
1162.5
79.7
784.0
152.4
2
FMS-sonic
Up 3
1160.3
1162.5
79.7
79.0
787.0
42.0