Table T1. Site 1117 coring summary. (Continued on next two pages.)
Hole 1117A |
---|
Latitude: 9° 46.526'S |
Longitude: 151° 32.945'E |
Seafloor (drill-pipe measurement from rig floor, mbrf): 1174.9 |
Distance between rig floor and sea level (m): 11.70 |
Water depth (drill-pipe measurement from sea level, m): 1163.2 |
Total depth (from rig floor, mbrf): 1286.0 |
Total penetration (mbsf): 111.1 |
Total number of cores: 14 |
Total length of cored section (m): 111.1 |
Total core recovered (m): 6.42 |
Core recovery (%): 6 |
Core | Date (July 1998) |
Time (UTC +10 hr) |
Depth (mbsf) |
Length cored (m) |
Length recovered (m) |
Recovery (%) |
Comments |
---|---|---|---|---|---|---|---|
180-1117A- |
|||||||
1R |
26 |
2215.0 |
0.0-12.2 |
12.2 |
4.07 |
33.4 |
|
2R |
27 |
330.0 |
12.2-18.6 |
6.4 |
0.17 |
2.7 |
|
3R |
27 |
635.0 |
18.6-28.2 |
9.6 |
0.04 |
0.4 |
|
4R |
27 |
800.0 |
28.2-37.8 |
9.6 |
0.00 |
0.0 |
No recovery |
5R |
27 |
1035.0 |
37.8-47.4 |
9.6 |
0.00 |
0.0 |
No recovery |
6R |
27 |
1240.0 |
47.4-57.0 |
9.6 |
0.00 |
0.0 |
No recovery |
7R |
27 |
1435.0 |
57.0-61.6 |
4.6 |
0.07 |
1.5 |
|
8R |
27 |
1605.0 |
61.6-66.6 |
5.0 |
0.12 |
2.4 |
|
9R |
27 |
1810.0 |
66.6-76.3 |
9.7 |
0.75 |
7.7 |
|
10R |
27 |
1940.0 |
76.3-85.9 |
9.6 |
0.16 |
1.7 |
|
11R |
27 |
2135.0 |
85.9-95.5 |
9.6 |
0.44 |
4.6 |
|
12R |
27 |
2355.0 |
95.5-105.2 |
9.7 |
0.36 |
3.7 |
|
13R |
28 |
150.0 |
105.2-110.0 |
4.8 |
0.15 |
3.1 |
|
14R |
28 |
425.0 |
110.0-111.1 |
1.1 |
0.09 |
8.2 |
|
Totals: |
111.10 |
6.42 |
5.8 |