Table T2. Site 1120 coring summary. Core number Core type Date (1998) Time Top depth (mbsf) Bottom depth (mbsf) Length cored (m) Length recovered (m) Recovery (%) 181-1120A- 1 H 28 Aug 0555 0.0 4.6 4.6 4.6 100 Cored totals: 4.6 4.6 100.00% Drilled: 0.0 Total: 4.6 181-1120B- 1 H 28 Aug 0655 0.0 3.3 3.3 3.36 101.80 2 H 28 Aug 0730 3.3 12.8 9.5 9.58 100.80 3 H 28 Aug 0800 12.8 22.3 9.5 4.90 51.60 4 H 28 Aug 0835 22.3 31.8 9.5 9.26 97.50 5 H 28 Aug 0910 31.8 41.3 9.5 9.64 101.50 6 H 28 Aug 1005 41.3 50.8 9.5 9.78 102.90 7 H 28 Aug 1035 50.8 60.3 9.5 8.66 91.20 8 H 28 Aug 1135 60.3 68.3 8.0 8.03 100.40 9 X 28 Aug 1235 68.3 72.6 4.3 2.57 59.80 10 X 28 Aug 1310 72.6 82.2 9.6 4.86 50.60 11 X 28 Aug 1340 82.2 91.8 9.6 4.45 46.40 12 X 28 Aug 1410 91.8 101.4 9.6 7.40 77.10 13 X 28 Aug 1440 101.4 111.0 9.6 2.21 23.00 14 X 28 Aug 1510 111.0 120.6 9.6 6.56 68.30 15 X 28 Aug 1545 120.6 130.1 9.5 6.28 66.10 16 X 28 Aug 1610 130.1 139.8 9.7 8.73 90.00 17 X 28 Aug 1640 139.8 149.4 9.6 8.49 88.40 18 X 28 Aug 1710 149.4 159.0 9.6 9.23 96.10 19 X 28 Aug 1735 159.0 168.7 9.7 7.93 81.80 20 X 28 Aug 1800 168.7 178.4 9.7 8.44 87.00 21 X 28 Aug 1835 178.4 188.0 9.6 6.15 64.10 Cored totals: 188.0 146.51 77.93% Drilled: 0.0 Total: 188.0 181-1120C- 1 H 30 Aug 300 0.0 6.6 6.6 6.59 99.8 2 H 30 Aug 345 6.6 16.1 9.5 9.12 96.0 3 H 30 Aug 415 16.1 25.6 9.5 9.51 100.1 4 H 30 Aug 455 25.6 35.1 9.5 9.95 104.7 5 H 30 Aug 1055 35.1 44.6 9.5 9.78 102.9 Cored totals: 44.6 44.95 100.78% Drilled: 0.0 Total: 44.6 181-1120D- 1 0 31 Aug 2045 0.0 157.4 0.0 0.0 N/A 1 X 31 Aug 2125 157.4 167.0 9.6 9.63 100.3 2 X 31 Aug 2155 167.0 176.7 9.7 9.73 100.3 3 X 31 Aug 2225 176.7 186.3 9.6 8.28 86.3 4 X 31 Aug 2255 186.3 195.9 9.6 8.48 88.3 5 X 31 Aug 2320 195.9 205.5 9.6 7.77 80.9 6 X 31 Aug 2359 205.5 210.1 4.6 8.72 189.6 7 X 01 Sep 0035 210.1 215.1 5.0 3.55 71.0 8 X 01 Sep 0110 215.1 218.7 3.6 6.75 187.5 9 X 01 Sep 0140 218.7 220.7 2.0 3.26 163.0 Cored totals: 63.3 66.17 104.53% Drilled: 157.4 Total: 220.7