Table T3. Site 1121 coring summary. Core number Core type Date (Sep 1998) Time Top depth (mbsf) Bottom depth (mbsf) Length cored (m) Length recovered (m) Recovery (%) 181-1121A- 1 H 02 1620 0.0 8.4 8.4 8.37 99.6 Cored totals: 8.4 8.37 99.64% Drilled: 0.0 Total: 8.4 181-1121B- 1 H 02 1740 0.0 9.5 9.5 9.92 104.4 2 H 02 1855 9.5 19.0 9.5 9.93 104.5 3 H 02 2025 19.0 23.0 4.0 9.83 245.8 4 X 02 2240 23.0 23.5 0.5 0.28 56.0 5 X 03 0040 23.5 32.7 9.2 0.27 2.9 6 X 03 0150 32.7 42.3 9.6 4.58 47.7 7 X 03 0255 42.3 52.0 9.7 8.35 86.1 8 X 03 0400 52.0 61.6 9.6 9.06 94.4 9 X 03 0455 61.6 71.2 9.6 9.68 100.8 10 X 03 0620 71.2 80.9 9.7 6.18 63.7 11 X 03 0740 80.9 90.5 9.6 6.32 65.8 12 X 03 1045 90.5 100.1 9.6 3.81 39.7 13 X 03 1300 100.1 109.7 9.6 0.39 4.1 14 X 03 1530 109.7 119.4 9.7 0.56 5.8 15 X 03 1745 119.4 126.0 6.6 2.93 44.4 16 X 03 2000 126.0 130.0 4.0 1.30 32.5 17 X 03 2355 130.0 139.7 9.7 4.47 46.1 Cored totals: 139.7 87.86 62.89% Drilled: 0.0 Total: 139.7