Table T1
(continued).
Core
Date
(August 1998)
Time
(UTC)
Core depth (mbsf)
Length (m)
Recovery
(%)
Section
Length (m)
Section depth (mbsf)
Catwalk
samples
Comment
Top
Bottom
Cored
Recovered
Liner
Curated
Top
Bottom
3H
29
1615
16.1
25.6
9.5
9.51
100.1
1
1.5
1.5
16.1
17.6
2
1.5
1.5
17.6
19.1
3
1.5
1.5
19.1
20.6
4
1.5
1.5
20.6
22.1
5
1.5
1.5
22.1
23.6
6
1.41
1.41
23.6
25.01
7
0.3
0.3
25.01
25.31
CC
0.3
0.3
25.31
25.61
PAL
9.51
9.51
4H
29
1655
25.6
35.1
9.5
9.95
104.7
1
1.5
1.5
25.6
27.1
2
1.5
1.5
27.1
28.6
3
1.5
1.5
28.6
30.1
4
1.5
1.5
30.1
31.6
5
1.5
1.5
31.6
33.1
6
1.5
1.5
33.1
34.6
7
0.72
0.72
34.6
35.32
CC
0.23
0.23
35.32
35.55
PAL
9.95
9.95
5H
29
2255
35.1
44.6
9.5
9.78
102.9
1
1.5
1.5
35.1
36.6
2
1.5
1.5
36.6
38.1
3
1.5
1.5
38.1
39.6
4
1.5
1.5
39.6
41.1
5
1.5
1.5
41.1
42.6
6
1.5
1.5
42.6
44.1
7
0.68
0.68
44.1
44.78
CC
0.1
0.1
44.78
44.88
PAL
All to PAL
9.78
9.78
Totals:
44.6
44.95
100.8
181-1120D-
10
31
0845
0
157.4
0
0
N/A
1X
31
0925
157.4
167
9.6
9.63
100.3
1
1.5
1.5
157.4
158.9
2
1.5
1.5
158.9
160.4
3
1.5
1.5
160.4
161.9
4
1.5
1.5
161.9
163.4
IW
5
1.5
1.5
163.4
164.9
HS
6
1.5
1.5
164.9
166.4
7
0.48
0.48
166.4
166.88
CC
0.15
0.15
166.88
167.03
PAL
9.63
9.63