Table T2 (continued).
Core
Date (September 1998)
Time
(UTC)Core depth (mbsf)
Length (m)
Recovery
(%) Section
Length (m)
Section depth (mbsf)
Catwalk
samples Comment
Top
Bottom
Cored
Recovered
Liner
Curated
Top
Bottom
6H
6
0630
47.3
56.8
9.5
9.06
95.4
1
1.5
1.5
47.3
48.8
2
1.5
1.5
48.8
50.3
3
1.5
1.5
50.3
51.8
4
1.5
1.5
51.8
53.3
IW
5
1.5
1.5
53.3
54.8
HS
6
1.41
1.41
54.8
56.21
CC
0.15
0.15
56.21
56.36
PAL
9.06
9.06
7H
6
0735
56.8
66.3
9.5
9.13
96.1
1
1.5
1.5
56.8
58.3
2
1.5
1.5
58.3
59.8
3
1.5
1.5
59.8
61.3
4
1.5
1.5
61.3
62.8
IW
5
1.5
1.5
62.8
64.3
HS
6
1.48
1.48
64.3
65.78
CC
0.15
0.15
65.78
65.93
PAL
All to PAL
9.13
9.13
8H
6
0845
66.3
75.8
9.5
7.69
80.9
1
0.64
0.64
66.3
66.94
Crushed liner
2
1.5
1.5
66.94
68.44
3
1.5
1.5
68.44
69.94
4
1.5
1.5
69.94
71.44
5
1.5
1.5
71.44
72.94
6
0.9
0.9
72.94
73.84
CC
0.15
0.15
73.84
73.99
PAL
All to PAL
7.69
7.69
9X
6
1005
75.8
85.4
9.6
0.81
8.4
1
0.66
0.66
75.8
76.46
HS
All to PAL
CC
0.15
0.15
76.46
76.61
PAL
0.81
0.81
10X
6
1105
85.4
95
9.6
0.44
4.6
1
0.29
0.29
85.4
85.69
HS
CC
0.15
0.15
85.69
85.84
PAL
0.44
0.44
11X
6
1225
95
104.7
9.7
1.92
19.8
1
1.5
1.5
95
96.5
IW
2
0.27
0.27
96.5
96.77
HS
CC
0.15
0.15
96.77
96.92
PAL
All to PAL
1.92
1.92