Table T1. Site 1129 coring summary.
 

Hole 1129A


Latitude: -33.2897617° (33°17.3857'S)

Longitude: 128.481197° (128°28.8718'E)

Seafloor (drill-pipe measurement from rig floor, mbrf): 214.2

Distance between rig floor and sea level (m): 11.3

Water depth (drill-pipe measurement from sea level, m): 202.9

Total depth (from rig floor, mbrf): 237.5

Penetration (mbsf): 23.3

Total number of cores: 2

Total length of cored section (m): 13.8

Total number of drilled intervals: 1

Total length of drilled intervals (m): 9.5

Total core recovered (m): 13.27

Core recovery (%): 96.2

Hole 1129B

Latitude: -33.2896350° (33°17.3781'S)

Longitude: 128.481010° (128°28.8606'E)

Seafloor (drill-pipe measurement from rig floor, mbrf): 214.00

Distance between rig floor and sea level (m): 11.7

Water depth (drill-pipe measurement from sea level, m): 202.3

Total depth (from rig floor, mbrf): 255.0

Penetration (mbsf): 41.0

Total number of cores: 2

Total length of cored section (m): 19.0

Total number of drilled intervals: 1

Total length of drilled intervals (m): 22.0

Total core recovered (m): 10.24

Core recovery (%): 53.9

Hole 1129C

Latitude: -33.296570° (33°17.7942'S)

Longitude: 128.481310° (128°28.8786'E)

Seafloor (drill-pipe measurement from rig floor, mbrf): 214.2

Distance between rig floor and sea level (m): 11.8

Water depth (drill-pipe measurement from sea level, m): 202.4

Total depth (from rig floor, mbrf): 665.8

Penetration (mbsf): 451.6

Total number of cores: 48

Total length of cored section (m): 451.6

Total core recovered (m): 322.89

Core recovery (%): 71.5

Hole 1129D

Latitude: -33.296475° (33°17.7885'S)

Longitude: 128.481115° (128°28.8669'E)

Seafloor (drill-pipe measurement from rig floor, mbrf): 214.0

Distance between rig floor and sea level (m): 11.9

Water depth (drill-pipe measurement from sea level, m): 202.1

Total depth (from rig floor, mbrf): 818.2

Penetration (mbsf): 604.2

Total number of cores: 26

Total length of cored section (m): 250.6

Total number of drilled intervals: 2

Total length of drilled intervals (m): 353.6

Total core recovered (m): 76.72

Core recovery (%): 30.6
 
Core Date
(Nov 1998)
Time
(UTC + 8 hr)
Depth
(mbsf)
Length
cored
(m)
Length
recovered
(m)
Recovery
(%)
Comment

182-1129A-











1H

11

1345

0.00-4.30

4.3

4.35

101.2


*****Drilled from 4.30 to 13.80 mbsf*****


2H

11

1515

13.80-23.30

9.5

8.92

93.9



Coring totals:






13.8

13.27

96.2



Drilled total:






9.5





Total:






23.3





182-1129B-










*****Drilled from 0 to 22.00 mbsf*****


1H

19

2250

22.00-31.50

9.5

8.41

88.5



2H

20

0030

31.50-41.00

9.5

1.83

19.3



Coring totals:






19.0

10.24

53.9



Drilled total:






22.0





Total:






41.0





182-1129C-











1H

25

0205

0.00-7.30

7.3

7.29

99.9



2H

25

0230

7.30-16.80

9.5

9.82

103.4



3H

25

0310

16.80-26.30

9.5

9.20

96.8



4H

25

0425

26.30-35.80

9.5

10.01

105.4



5H

25

0445

35.80-45.30

9.5

9.53

100.3

H2S

6H

25

0535

45.30-54.80

9.5

9.80

103.2

H2S

7H

25

0615

54.80-64.30

9.5

7.67

80.7

H2S

8H

25

0730

64.30-73.80

9.5

10.11

106.4

H2S

9H

25

0810

73.80-83.30

9.5

8.32

87.6

H2S

10H

25

0910

83.30-92.80

9.5

9.80

103.2

H2S

11H

25

0950

92.80-102.30

9.5

8.85

93.2

H2S

12H

25

1030

102.30-111.80

9.5

9.54

100.4

H2S

13H

25

1110

111.80-121.30

9.5

9.33

98.2

H2S

14H

25

1210

121.30-130.80

9.5

9.71

102.2

H2S

15H

25

1250

130.80-140.30

9.5

9.76

102.7

H2S

16H

25

1330

140.30-149.80

9.5

9.64

101.5

H2S

17H

25

1400

149.80-159.30

9.5

9.33

98.2

H2S

18H

25

1440

159.30-168.80

9.5

9.59

101.0

H2S

19H

25

1515

168.80-178.30

9.5

9.53

100.3

H2S

20H

25

1615

178.30-187.80

9.5

9.77

102.8

H2S

21H

25

1725

187.80-197.30

9.5

6.41

67.5

H2S; crushed liner; sediment pushed into new liner; totally disturbed

22H

25

1840

197.30-206.80

9.5

7.47

78.6

H2S

23H

25

1935

206.80-216.30

9.5

7.72

81.3

H2S; crushed liner; contents transferred to new liner

24X

25

2040

216.30-225.70

9.4

0.19

2.0

H2S

25X

25

2100

225.70-235.20

9.5

5.95

62.6

H2S

26X

25

2135

235.20-244.70

9.5

5.33

56.1

H2S

27X

25

2210

244.70-254.40

9.7

7.68

79.2

H2S

28X

25

2240

254.40-263.90

9.5

7.81

82.2

H2S

29X

25

2310

263.90-273.30

9.4

7.77

82.7

H2S

30X

25

2355

273.30-282.80

9.5

7.87

82.8

H2S

31X

26

0035

282.80-291.50

8.7

0.16

1.8

H2S

32X

26

0115

291.50-301.00

9.5

0.00

0.0

No recovery

33X

26

0210

301.00-310.40

9.4

6.93

73.7

H2S

34X

26

0250

310.40-319.80

9.4

6.96

74.0

H2S

35X

26

0330

319.80-329.10

9.3

8.70

93.6

H2S

36X

26

0500

329.10-338.00

8.9

6.76

76.0

H2S

37X

26

0545

338.00-346.90

8.9

9.50

106.7

H2S

38X

26

0630

346.90-355.70

8.8

5.49

62.4

H2S

39X

26

0715

355.70-365.00

9.3

4.19

45.1

H2S

40X

26

0810

365.00-374.50

9.5

6.50

68.4

H2S

41X

26

0910

374.50-384.20

9.7

0.07

0.7

H2S

42X

26

0950

384.20-393.90

9.7

0.00

0.0

No recovery

43X

26

1020

393.90-403.60

9.7

1.89

19.5

H2S

44X

26

1100

403.60-413.30

9.7

0.16

1.7

H2S

45X

26

1220

413.30-422.90

9.6

0.73

7.6



46X

26

1300

422.90-432.40

9.5

10.06

105.9



47X

26

1400

432.40-442.00

9.6

1.08

11.3



48X

26

1445

442.00-451.60

9.6

2.91

30.3



Totals:






451.6

322.89

71.5



182-1129D-










*****Drilled from 0 to 280.00 mbsf*****


1R

29

0335

280.00-289.80

9.8

2.36

24.1

H2S

2R

29

0405

289.80-299.60

9.8

0.80

8.2

H2S
*****Drilled from 299.60 to 373.20 mbsf*****


3R

29

0745

373.20-382.80

9.6

0.45

4.7

H2S

4R

29

0820

382.80-392.60

9.8

0.43

4.4

H2S

5R

29

0850

392.60-402.30

9.7

0.37

3.8

H2S

6R

29

0940

402.30-411.90

9.6

0.85

8.9

H2S

7R

29

1040

411.90-421.50

9.6

1.47

15.3

H2S

8R

29

1115

421.50-431.10

9.6

1.49

15.5

H2S

9R

29

1205

431.10-440.70

9.6

3.65

38.0

H2S

10R

29

1235

440.70-450.30

9.6

1.85

19.3

H2S

11R

29

1310

450.30-459.90

9.6

3.37

35.1

H2S

12R

29

1350

459.90-469.50

9.6

2.13

22.2

H2S

13R

29

1420

469.50-479.10

9.6

7.46

77.7

H2S

14R

29

1500

479.10-488.70

9.6

2.68

27.9

H2S

15R

29

1535

488.70-498.30

9.6

3.03

31.6

H2S

16R

29

1605

498.30-507.90

9.6

9.36

97.5

H2S

17R

29

1645

507.90-517.50

9.6

4.27

44.5

H2S

18R

29

1725

517.50-527.10

9.6

4.05

42.2

H2S

19R

29

1805

527.10-536.80

9.7

6.12

63.1

H2S

20R

29

1840

536.80-546.50

9.7

9.56

98.6

H2S

21R

29

1915

546.50-556.10

9.6

8.23

85.7

H2S

22R

29

2000

556.10-565.80

9.7

1.60

16.5

H2S

23R

29

2100

565.80-575.40

9.6

0.14

1.5



24R

29

2140

575.40-585.00

9.6

0.47

4.9



25R

29

2225

585.00-594.60

9.6

0.20

2.1



26R

29

2315

594.60-604.20

9.6

0.33

3.4



Coring totals:






250.6

76.72

30.6



Drilled total:






353.6





Total:






604.2




Note: UTC = Universal Time Coordinated.