Table T1. Site 1130 coring summary.
 

Hole 1130A


Latitude: -33.420190° (33°25.2114'S)

Longitude: 127.602330° (127°36.1398'E)

Seafloor (drill-pipe measurement from rig floor, mbrf): 498.0

Distance between rig floor and sea level (m): 11.3

Water depth (drill-pipe measurement from sea level, m): 486.7

Total depth (from rig floor, mbrf): 878.4

Penetration (mbsf): 380.4

Total number of cores: 41

Total length of cored section (m): 380.4

Total core recovered (m): 312.47

Core recovery (%): 82.1

Hole 1130B

Latitude: -33.4201517° (33°25.2091'S)

Longitude: 127.60208° (127°36.1248'E)

Seafloor (drill-pipe measurement from rig floor, mbrf): 499.5

Distance between rig floor and sea level (m): 11.4

Water depth (drill-pipe measurement from sea level, m): 488.1

Total depth (from rig floor, mbrf): 809.9

Penetration (mbsf): 310.4

Total number of cores: 33

Total length of cored section (m): 310.4

Total core recovered (m): 300.8

Core recovery (%): 96.9

Hole 1130C

Latitude: -33.419980° (33°25.1988'S)

Longitude: 127.602080° (127°36.1248'E)

Seafloor (drill-pipe measurement from rig floor, mbrf): 499.5

Distance between rig floor and sea level (m): 11.5

Water depth (drill-pipe measurement from sea level, m): 488.0

Total depth (from rig floor, mbrf): 894.7

Penetration (mbsf): 395.2

Total number of cores: 10

Total length of cored section (m): 96.0

Total number of drilled intervals: 1

Total length of drilled intervals (m): 299.2

Total core recovered (m): 23.3

Core recovery (%): 24.3
 
Core Date
(Nov 1998)
Time
(UTC + 8 hr)
Depth
(mbsf)
Length
cored
(m)
Length
recovered
(m)
Recovery
(%)
Comment

180-1130A-










1H

12

0215

0.00-8.50

8.5

8.48

99.8


2H

12

0240

8.50-18.00

9.5

9.53

100.3


3H

12

0345

18.00-27.50

9.5

3.99

42.0

Oriented

4H

12

0500

27.50-37.00

9.5

9.23

97.2

Oriented

5H

12

0600

37.00-46.50

9.5

10.06

105.9

Oriented

6H

12

0705

46.50-56.00

9.5

9.49

99.9

Oriented

7H

12

0800

56.00-65.50

9.5

9.45

99.5

Oriented

8H

12

0925

65.50-75.00

9.5

8.90

93.7

Oriented

9H

12

1000

75.00-84.50

9.5

8.90

93.7

Oriented

10H

12

1020

84.50-94.00

9.5

9.10

95.8

Oriented

11H

12

1115

94.00-103.50

9.5

9.37

98.6

Oriented

12H

12

1210

103.50-113.00

9.5

9.46

99.6

Oriented

13H

12

1420

113.00-122.50

9.5

9.57

100.7

Oriented; DVTP; top 50 cm maybe disturbed

14H

12

1500

122.50-132.00

9.5

9.44

99.4

Oriented

15H

12

1535

132.00-141.50

9.5

8.35

87.9

Oriented

16H

12

1650

141.50-151.00

9.5

9.41

99.1

Oriented; core liner broke between Sections 2 and 3; ~ 20 cm lost

17H

12

1720

151.00-160.50

9.5

9.83

103.5

Oriented

18H

12

2030

160.50-170.00

9.5

9.91

104.3

Drill over

19X

12

2125

170.00-177.40

7.4

9.73

131.5



20X

12

2150

177.40-187.00

9.6

7.20

75.0



21X

12

2220

187.00-196.60

9.6

6.54

68.1



22X

12

2245

196.60-206.20

9.6

9.28

96.7



23X

12

2310

206.20-215.80

9.6

9.76

101.7



24X

12

2340

215.80-225.40

9.6

8.93

93.0



25X

13

0015

225.40-235.00

9.6

8.96

93.3



26X

13

0045

235.00-244.60

9.6

5.62

58.5



27X

13

0110

244.60-254.30

9.7

9.70

100.0



28X

13

0140

254.30-263.90

9.6

8.99

93.7



29X

13

0215

263.90-273.50

9.6

9.84

102.5



30X

13

0240

273.50-283.10

9.6

9.38

97.7



31X

13

0310

283.10-292.80

9.7

9.68

99.8



32X

13

0345

292.80-302.40

9.6

9.64

100.4



33X

13

0415

302.40-312.00

9.6

9.70

101.0



34X

13

0540

312.00-321.70

9.7

8.15

84.0



35X

13

0720

321.70-331.30

9.6

7.22

75.2



36X

13

0930

331.30-340.90

9.6

0.06

0.6



37X

13

1030

340.90-350.40

9.5

0.22

2.3



38X

13

1135

350.40-359.90

9.5

1.00

10.5



39X

13

1320

359.90-369.50

9.6

0.03

0.3



40X

13

1440

369.50-379.10

9.6

0.37

3.9



41X

13

1645

379.10-380.40

1.3

0.00

0.0

No recovery

Totals:






380.4

312.47

82.1



180-1130B-











1H

13

1920

0.00-4.00

4.0

3.93

98.3



2H

13

1945

4.00-13.50

9.5

8.75

92.1



3H

13

2030

13.50-23.00

9.5

0.10

1.1

Oriented

4H

13

2100

23.00-32.50

9.5

9.95

104.7

Oriented

5H

13

2130

32.50-42.00

9.5

9.45

99.5

Oriented

6H

13

2240

42.00-51.50

9.5

7.33

77.2

Oriented; extremely disturbed; liner completely destroyed; entire core transferred section by section; liner replaced

7H

13

2345

51.50-61.00

9.5

9.17

96.5

Oriented

8H

14

0035

61.00-70.50

9.5

9.63

101.4

Oriented

9H

14

0120

70.50-80.00

9.5

9.94

104.6

Oriented

10H

14

0150

80.00-89.50

9.5

9.16

96.4

Oriented

11H

14

0220

89.50-99.00

9.5

9.61

101.2

Oriented

12H

14

0255

99.00-108.50

9.5

8.94

94.1

Oriented

13H

14

0325

108.50-118.00

9.5

9.96

104.8

Oriented

14H

14

0350

118.00-127.50

9.5

9.87

103.9

Oriented

15H

14

0420

127.50-137.00

9.5

9.86

103.8

Oriented

16H

14

0455

137.00-146.50

9.5

9.14

96.2

Oriented; liner split at top and bottom; bottom section liner patched; Section 2 patched in new liner

17H

14

0525

146.50-156.00

9.5

9.73

102.4

Oriented

18X

14

0620

156.00-165.60

9.6

9.89

103.0


19X

14

0645

165.60-175.30

9.7

9.84

101.4


20X

14

0710

175.30-185.00

9.7

9.66

99.6


21X

14

0730

185.00-194.70

9.7

9.86

101.7


22X

14

0755

194.70-204.40

9.7

9.79

100.9


23X

14

0815

204.40-214.10

9.7

9.66

99.6


24X

14

0840

214.10-223.80

9.7

9.10

93.8


25X

14

0855

223.80-233.50

9.7

9.75

100.5


26X

14

0925

233.50-243.10

9.6

9.78

101.9


27X

14

0950

243.10-252.70

9.6

9.88

102.9


28X

14

1020

252.70-262.30

9.6

9.86

102.7


29X

14

1045

262.30-272.00

9.7

9.85

101.6


30X

14

1115

272.00-281.60

9.6

9.83

102.4


31X

14

1150

281.60-291.20

9.6

9.89

103.0


32X

14

1220

291.20-300.80

9.6

9.88

102.9


33X

14

1255

300.80-310.40

9.6

9.76

101.7


Totals:






310.4

300.80

96.9


180-1130C-









*****Drilled from 0 to 299.2 mbsf*****

1R

15

0340

299.20-308.80

9.6

7.66

79.8


2R

15

0405

308.80-318.50

9.7

7.65

78.9


3R

15

0435

318.50-328.10

9.6

4.87

50.7


4R

15

0510

328.10-337.70

9.6

0.09

0.9


5R

15

0535

337.70-347.40

9.7

0.04

0.4


6R

15

0625

347.40-356.90

9.5

0.12

1.3


7R

15

0700

356.90-366.40

9.5

0.23

2.4


8R

15

0920

366.40-376.00

9.6

1.63

17.0


9R

15

1130

376.00-385.60

9.6

0.10

1.0


10R

15

1525

385.60-395.20

9.6

0.91

9.5


Coring totals:






96.0

23.30

24.3


Drilled total:






299.2




Total:






395.2



Note: UTC = Universal Time Coordinated; DVTP = Davis-Villinger temperature probe.