Table T9. Site 1137 lava-flow thickness and recovery.

Basement
unit/subunit
Thickness
(m)

Recovery
Based on
logging
depths
Based on
curated
depths
(m) (%)
1 6.1 12.71
5.42 89
2A 2.9 1.98
1.79 62
2B 7.2 13.40
6.82 95
2 totals: 10.1 15.38
8.61 85
3A 9.6 3.82
4.68 49
3B 7.0 7.68
6.46 92
3 totals: 16.6 11.50
11.14 67
4 26.7 27.62
24.22 91
5 4.4 4.29
4.29 98
6 31.0 31.79
11.98 39
7A 5.8 4.93
4.62 83
7B 7.2 6.41
5.66 99
7 totals: 13.0 11.34
10.28 77
8A 3.4 1.00
0.92 27
8B 7.6 8.89
7.03 92
8 totals: 11.0 9.89
7.95 72
9 14.9 16.64
12.67 85
10A 3.5 3.30
3.05 87
10B 6.2 6.24
6.20 100
10 totals: 9.7 9.54
9.25 95

Note: Percent recovery is calculated using downhole logging-derived unit thicknesses.