Date (January 1999) |
Time (UTC) |
Logging operations |
---|---|---|
26
|
1800
|
Hole preparation complete, rig up wireline. |
|
0900
|
Rig into hole with HNGS-APS-HLDS-DITE(+TAP). |
|
2025
|
Uplog at 900 ft/hr from 322.5 mbsf to seafloor. Rig into hole to total depth. |
|
2155
|
Repeat uplog at 900 ft/hr from 322.5 to 227 mbsf. Rig out of hole. |
|
2330
|
Tool on rig floor. |
27
|
0030
|
Rig-up NGT-LSS-FMS. |
|
0100
|
Rig into hole with NGT-LSS-FMS. |
|
0220
|
Uplog at 900 ft/hr from 322.5 mbsf to the end of pipe. Rig down hole for repeat run. |
|
0255
|
Repeat uplog at 900 ft/hr from 322.5 mbsf to end of pipe. Pull rig out of hole. |
|
0430
|
Tools back on rig floor. |
|
0530
|
Start rig-up WST. |
|
0555
|
Rig into hole with WST. |
|
0655
|
Performed multiple shots at ten stations; source offset is 49.0 m. |
|
0845
|
End of shots. Pull tool out of hole. |
|
0945
|
End of logging operations. |
Note: UTC = Universal Time Coordinated. Drillers total depth = 2728.5 mbsf, water depth = 2406 mbrf, end of pipe = 80 mbsf. Tool acronyms are defined in Table T14 in the "Explanatory Notes" chapter.