Table T15. Summary of logging operations at Site 1143.

Date
(March 1999)
Time
(local)

6 0015 Hole preparation complete, rig up wireline.
6 0045 Rig into hole with HNGS-APS-HLDS-DIT-TAP.
6 0400 Uplog at 275 m/hr from 400 to 305 mbsf. Rig into hole to total depth.
6 0420 Uplog at 275 m/hr from 400 mbsf to seafloor. Pull out of hole.
6 0800 Pipe trip.
6 1030 Rig up NGT-FMS-DSI.
6 1115 DSI failure, troubleshoot, DSI replaced by LSS.
6 1300 Rig into hole with NGT-FMS-LSS.


Bridge near end of pipe (EOP) prevents going down. Pull out of hole.
6 1700 Reposition EOP at 134 mbsf.
6 1745 Rig into hole with NGT-FMS-LSS.
6 2020 Uplog at 275 m/hr from 378 mbsf to EOP.
6 2315 End of logging operations.

Note: HNGS = hostile environment natural gamma-ray sonde, APS = accelerator porosity sonde, HLDS = hostile environment lithodensity sonde, DIT = dual-induction tool, TAP = Lamont-Doherty Earth Observatory (LDEO) temperature/acceleration/pressure tool, NGT = natural gamma-ray tool, FMS = Formation MicroScanner, DSI = dipole sonic imager, LSS = long-spaced sonic logging tool.