Table T16. Summary of logging operations at Site 1144.
Date (March 1999) |
Time (local) |
|
---|---|---|
15 | 1145 | Hole preparation complete. Rig up wireline. |
15 | 1310 | Rig into hole with HNGS-APS-HLDS-DIT. |
15 | 1443 | Uplog at 275 m/hr from 443 to 370 mbsf. Rig into hole to total depth. |
15 | 1505 | Uplog at 275 m/hr from 443 mbsf to EOP. Pull out of hole. |
15 | 1830 | Rig into hole with NGT-FMS-LSS. |
15 | 2014 | Uplog at 275 m/hr from 447 mbsf to EOP. Rig into hole to total depth. |
15 | 2135 | Uplog at 275 m/hr from 447 mbsf to EOP. Pull out of hole. |
16 | 0035 | Rig into hole with NGT-GHMT-GPIT. |
16 | 0310 | Uplog at 275 m/hr from 445 mbsf to EOP. Rig into hole to total depth. |
16 | 0400 | Uplog at 275 m/hr from 450 mbsf to EOP. Pull out of hole. |
16 | 0530 | End of logging operations. |
Note: HNGS = hostile environment natural gamma-ray sonde, APS = accelerator porosity sonde, HLDS = hostile environment lithodensity sonde, DIT = dual-induction tool, EOP = end of pipe, NGT = natural gamma-ray tool, FMS = Formation MicroScanner, LSS = long-spaced sonic logging tool, GHMT = geological high-resolution magnetic tool, GPIT = general-purpose inclinometer tool.