Table T16. Summary of logging operations at Site 1144.

Date
(March 1999)
Time
(local)

15 1145 Hole preparation complete. Rig up wireline.
15 1310 Rig into hole with HNGS-APS-HLDS-DIT.
15 1443 Uplog at 275 m/hr from 443 to 370 mbsf. Rig into hole to total depth.
15 1505 Uplog at 275 m/hr from 443 mbsf to EOP. Pull out of hole.
15 1830 Rig into hole with NGT-FMS-LSS.
15 2014 Uplog at 275 m/hr from 447 mbsf to EOP. Rig into hole to total depth.
15 2135 Uplog at 275 m/hr from 447 mbsf to EOP. Pull out of hole.
16 0035 Rig into hole with NGT-GHMT-GPIT.
16 0310 Uplog at 275 m/hr from 445 mbsf to EOP. Rig into hole to total depth.
16 0400 Uplog at 275 m/hr from 450 mbsf to EOP. Pull out of hole.
16 0530 End of logging operations.

Note: HNGS = hostile environment natural gamma-ray sonde, APS = accelerator porosity sonde, HLDS = hostile environment lithodensity sonde, DIT = dual-induction tool, EOP = end of pipe, NGT = natural gamma-ray tool, FMS = Formation MicroScanner, LSS = long-spaced sonic logging tool, GHMT = geological high-resolution magnetic tool, GPIT = general-purpose inclinometer tool.