Table T17. Summary of logging operations at Site 1146.
Date (March 1999) |
Time (local) |
|
---|---|---|
24
|
1600
|
Hole preparation complete. Rig up wireline. |
24
|
1732
|
Rig into hole with HNGS-APS-HLDS-DIT. |
24
|
1941
|
Uplog at 275 m/hr from 606 to 547 mbsf. Rig into hole to total depth. |
24
|
2005
|
Uplog at 275 m/hr from 606 mbsf to EOP. Pull out of hole. |
|
|
Pipe trip to new EOP at 242 mbsf. |
25
|
0105
|
Rig into hole with NGT-FMS-LSS. |
25
|
0246
|
Uplog at 275 m/hr from 606 mbsf to EOP. Rig into hole to total depth. |
25
|
0410
|
Uplog at 275 m/hr from 606 mbsf to EOP. Pull out of hole. |
25
|
0707
|
Rig into hole with NGT-GHMT-GPIT. |
25
|
0851
|
Uplog at 550 m/hr from 606 mbsf to EOP. Rig into hole to total depth. |
|
|
Total magnetic field tool failed and then fixed. |
25
|
0945
|
Uplog at 550 m/hr from 606 mbsf to EOP. Rig into hole to total depth. |
25
|
1025
|
Uplog at 550 m/hr from 606 mbsf to EOP. Pull out of hole. |
25
|
1235
|
End of logging operations. |
Note: HNGS = hostile environment natural gamma-ray sonde, APS = accelerator porosity sonde, HLDS = hostile environment lithodensity sonde, DIT = dual-induction tool, EOP = end of pipe, NGT = natural gamma-ray tool, FMS = Formation MicroScanner, LSS = long-spaced sonic logging tool, GHMT = geological high-resolution magnetic tool, GPIT = general-purpose inclinometer tool.