Table T17. Summary of logging operations at Site 1146.

Date
(March 1999)
Time
(local)

24
1600
Hole preparation complete. Rig up wireline.
24
1732
Rig into hole with HNGS-APS-HLDS-DIT.
24
1941
Uplog at 275 m/hr from 606 to 547 mbsf. Rig into hole to total depth.
24
2005
Uplog at 275 m/hr from 606 mbsf to EOP. Pull out of hole.


Pipe trip to new EOP at 242 mbsf.
25
0105
Rig into hole with NGT-FMS-LSS.
25
0246
Uplog at 275 m/hr from 606 mbsf to EOP. Rig into hole to total depth.
25
0410
Uplog at 275 m/hr from 606 mbsf to EOP. Pull out of hole.
25
0707
Rig into hole with NGT-GHMT-GPIT.
25
0851
Uplog at 550 m/hr from 606 mbsf to EOP. Rig into hole to total depth.


Total magnetic field tool failed and then fixed.
25
0945
Uplog at 550 m/hr from 606 mbsf to EOP. Rig into hole to total depth.
25
1025
Uplog at 550 m/hr from 606 mbsf to EOP. Pull out of hole.
25
1235
End of logging operations.

Note: HNGS = hostile environment natural gamma-ray sonde, APS = accelerator porosity sonde, HLDS = hostile environment lithodensity sonde, DIT = dual-induction tool, EOP = end of pipe, NGT = natural gamma-ray tool, FMS = Formation MicroScanner, LSS = long-spaced sonic logging tool, GHMT = geological high-resolution magnetic tool, GPIT = general-purpose inclinometer tool.