Initial Reports Volume 185 Chapter 4, Table T1. Coring summary, Site 1149. Notes: * = APC cores were oriented in azimuth beginning with Core 4H. PFT = perfluorocarbon tracer. Date Ship local Depth (mbsf) Length (m) Recovery Core (1999) time Top Bottom Cored Recovered (%) Comments 185-1149A- 1H 24-May 0245 0.0 4.2 4.2 4.23 100.7 2H 24-May 0430 4.2 13.7 9.5 9.95 104.7 Drill string acceleration 3H 24-May 0550 13.7 23.2 9.5 9.81 103.3 Bead test for microbiological contamination study 4H* 24-May 0740 23.2 32.7 9.5 9.91 104.3 Temperature recording 5H 24-May 0855 32.7 42.2 9.5 9.55 100.5 6H 24-May 1035 42.2 51.7 9.5 9.87 103.9 Temperature recording; Bead test and PFT test for microbiological contamination study 7H 24-May 1150 51.7 61.2 9.5 9.58 100.8 8H 24-May 1320 61.2 70.7 9.5 9.94 104.6 Temperature recording 9H 24-May 1530 70.7 80.2 9.5 9.38 98.7 Bead test and PFT test for microbiological contamination study 10H 24-May 1800 80.2 89.7 9.5 9.82 103.4 Drill string acceleration 11H 24-May 1950 89.7 99.2 9.5 9.63 101.4 PFT test for microbiological contamination study 12H 24-May 2110 99.2 108.7 9.5 9.93 104.5 Bead test for microbiological contamination study 13H 24-May 2230 108.7 118.2 9.5 9.46 99.6 14H 24-May 2340 118.2 127.7 9.5 10.05 105.8 15H 25-May 0055 127.7 137.2 9.5 9.85 103.7 16H 25-May 0210 137.2 146.7 9.5 9.89 104.1 17H 25-May 0325 146.7 156.2 9.5 9.89 104.1 18H 25-May 0440 156.2 164.4 8.2 8.34 101.7 19X 25-May 0650 164.4 169.8 5.4 1.79 33.2 20X 25-May 0820 169.8 179.1 9.3 2.06 22.2 21X 25-May 1010 179.1 188.7 9.6 1.21 12.6 22X 25-May 1305 188.7 190.9 2.2 0.00 0.0 23N 25-May 1625 190.9 191.2 0.3 0.30 100.0 Motor driven core barrel Coring totals: 191.2 174.44 91.2 185-1149B- 26-May 2300 ***Drilled from 0.0 to 151.1 mbsf*** 1W 27-May 0040 151.1 160.6 9.5 3.79 39.9 2R 27-May 0315 160.6 170.3 9.7 0.76 7.8 3R 27-May 0510 170.3 180.0 9.7 9.73 100.3 4R 27-May 0735 180.0 189.4 9.4 0.33 3.5 5R 27-May 0950 189.4 198.7 9.3 0.12 1.3 6R 27-May 1145 198.7 203.7 5.0 0.32 6.4 7R 27-May 1335 203.7 208.1 4.4 0.43 9.8 8R 27-May 1615 208.1 217.4 9.3 0.09 1.0 9R 27-May 1825 217.4 226.8 9.4 0.40 4.3 10R 27-May 2035 226.8 236.3 9.5 0.21 2.2 11R 27-May 2305 236.3 245.4 9.1 0.22 2.4 12R 28-May 0110 245.4 254.6 9.2 0.14 1.5 13R 28-May 0325 254.6 263.9 9.3 0.12 1.3 14R 28-May 0600 263.9 273.3 9.4 0.07 0.7 15R 28-May 0915 273.3 282.3 9.0 0.03 0.3 16R 28-May 1625 282.3 292.0 9.7 1.11 11.4 17R 28-May 2000 292.0 301.6 9.6 0.22 2.3 18R 28-May 2250 301.6 311.3 9.7 1.10 11.3 19R 29-May 0125 311.3 320.9 9.6 1.27 13.2 20R 29-May 0405 320.9 330.5 9.6 1.22 12.7 21R 29-May 0655 330.5 340.1 9.6 0.17 1.8 22R 29-May 0910 340.1 349.7 9.6 0.98 10.2 23R 29-May 1135 349.7 359.2 9.5 0.27 2.8 24R 29-May 1410 359.2 368.7 9.5 0.66 6.9 25R 29-May 1650 368.7 378.1 9.4 0.25 2.7 26R 29-May 1905 378.1 387.6 9.5 0.73 7.7 27R 29-May 2200 387.6 397.1 9.5 0.89 9.4 28R 30-May 0345 397.1 406.8 9.7 2.37 24.4 29R 30-May 1050 406.8 416.4 9.6 3.16 32.9 30R 30-May 1630 416.4 426.0 9.6 3.19 33.2 31R 30-May 2215 426.0 435.6 9.6 1.25 13.0 32R 31-May 0420 435.6 445.2 9.6 1.12 11.7 Coring totals: 294.1 36.72 12.5 Drilled: 151.1 Total: 445.2 185-1149C- 1W 3-Jun 1610 0.0 237.0 237.0 1.63 0.7 2W 3-Jun 2200 237.0 283.6 46.6 0.22 0.5 3R 4-Jun 0320 283.6 293.2 9.6 0.46 4.8 4R 4-Jun 0840 293.2 302.8 9.6 0.25 2.6 5R 4-Jun 1715 302.8 312.4 9.6 0.30 3.1 6R 4-Jun 1930 312.4 322.0 9.6 0.48 5 7W 5-Jun 0200 322.0 388.2 66.2 0.46 0.7 8R 5-Jun 1010 388.2 397.9 9.7 0.96 9.9 9R 5-Jun 2205 397.9 407.5 9.6 1.00 10.4 10R 6-Jun 0330 407.5 417.1 9.6 1.60 16.7 11R 6-Jun 1235 417.1 426.7 9.6 1.34 14 Coring totals: 426.7 8.70 2 185-1149D- 1W 8-Jun 0610 ***Drilled from 0.0 to 272.2 mbsf*** 2R 8-Jun 0830 272.2 281.6 9.4 0.29 3.1 3R 8-Jun 1040 281.6 290.9 9.3 0.31 3.3 4R 8-Jun 1330 290.9 300.3 9.4 0.63 6.7 5R 8-Jun 1945 300.3 310.0 9.7 0.30 3.1 6R 9-Jun 0255 310.0 319.7 9.7 2.07 21.3 7R 9-Jun 0745 319.7 329.3 9.6 2.84 29.6 8R 9-Jun 1755 329.3 338.8 9.5 3.03 31.9 9R 10-Jun 0045 338.8 348.4 9.6 2.75 28.7 10R 10-Jun 0645 348.4 357.9 9.5 2.01 21.2 Bead test for microbiological contamination study 11R 10-Jun 1225 357.9 367.4 9.5 4.60 48.4 Bead test for microbiological contamination study 12R 10-Jun 1655 367.4 377.0 9.6 0.60 6.3 Bead test for microbiological contamination study 13R 10-Jun 2215 377.0 386.6 9.6 1.27 13.2 Bead test for microbiological contamination study 14R 11-Jun 1030 386.6 396.3 9.7 0.36 3.7 Bead test for microbiological contamination study 15R 11-Jun 1645 396.3 405.9 9.6 0.80 8.3 Bead test for microbiological contamination study 16R 11-Jun 2225 405.9 415.5 9.6 2.69 28 Bead test for microbiological contamination study 17R 12-Jun 0515 415.5 425.1 9.6 1.61 16.8 18R 12-Jun 1125 425.1 434.7 9.6 1.59 16.6 19R 12-Jun 1610 434.7 440.4 5.7 1.00 17.5 Coring totals: 168.2 29.94 17.8 Drilled: 272.2 Total: 440.4