Figure F89. A. Time and temperature record of the first water sampling run. Near the seafloor (mudline) the temperature of the tool was allowed to stabilize for 10 min. The tool was then lowered into position in the bit (latch in). Then the whole drill string was advanced to 490 mbsf. After 10 min the drill string was raised and the tool released and brought back to the surface. B. Expanded view of the first run. C. The sequence of events for the second WSTP tool deployment were the same as for the first. Water was collected at 540 mbsf. D. Expanded view of the second run.