Table T1. Site 1150 coring summary.

Hole 1150A

Latitude: 39.1819117° (39°10.9147´N)
Longitude: 143.331925° (143°19.9155´E)
Time on hole: 99.75 hr (1830 hr, 22 June 1999-2215 hr, 26 June 1999)
Time on site: 309.5 hr (1830 hr, 22 June 1999-1900 hr, 28 June 1999)
Seafloor (drill-pipe measurement from rig floor, mbrf): 2692.2
Distance between rig floor and sea level (m): 11.3
Water depth (drill-pipe measurement from sea level, m): 2680.9
Total depth (from rig floor, mbrf): 3414.8
Total penetration (mbsf): 722.6
Total length of cored section (m): 722.6
Total core recovered (m): 566.4
Core recovery (%): 78.4
Total number of cores: 76
Total number of drilled intervals: 0

Hole 1150B

Latitude: 39.1819077° (39°10.91446´N)
Longitude: 143.3324432° (143°19.94659´E)
Time on hole: 159.25 hr (2215 hr, June 1999-1330 hr, 3 July 1999)
Seafloor (drill-pipe measurement from rig floor, mbrf): 2692.2
Distance between rig floor and sea level (m): 11.4
Water depth (drill-pipe measurement from sea level, m): 2680.8
Total depth (from rig floor, mbrf): 3873.8
Total penetration (mbsf): 1181.6
Total length of cored section (m): 478.3
Total length of drilled intervals (m): 703.3
Total core recovered (m): 269.29
Core recovery (%): 56.3
Total number of cores: 50
Total number of drilled intervals: 1
Hole 1150C
Latitude: 39.181953° (39°10.9172´N)
Longitude: 143.33157° (143°19.8942´E)
Time on Hole 1150C1: 207.0 hr (1330 hr, 3 July 1999-0430 hr, 12 July 99)
Time on Hole 1150C2: 7.0 hr (1530 hr, 22 July 1999-2230 hr, 23 July 1999)
Seafloor (drill-pipe measurement from rig floor, mbrf): 2692.2
Distance between rig floor and sea level (m): 11.4
Water depth (drill-pipe measurement from sea level, m): 2680.8
Comments: Drilling, casing, and emplacement of downhole instrument. No coring.
Hole 1150D
Latitude: 39.1813383° (39°10.8803´N)
Longitude: 143.33193° (143°19.9158´E)
Time on Hole 1150D1: 161.0 hr (0430 hr, 12 July 1999-2130 hr, 18 July 1999)
Time on Hole 1150D2: 30.5 hr (0700 hr, 22 July 1999-23 July 1999)
Time on Hole 1150D3: 118.0 hr (2230 hr, 23 July 1999-1900 hr, 28 July 1999)
Seafloor (drill-pipe measurement from rig floor, mbrf): 2692.2
Distance between rig floor and sea level (m): 11.5
Water depth (drill-pipe measurement from sea level, m): 2680.7
Comments: Drilling, casing, and emplacement of downhole instrument. No coring.

 
Core
Date
(1999)
Time
(Local)
Depth (mbsf)
Length (m)
Recovery
(%)
Comments
Top
Bottom
Cored
Recovered
186-1150A-

           
1H
23 June
0550
0.0 7.7   7.7 7.73 100.4
2H
23 June
0650
7.7 17.2   9.5 10.04 105.7
3H
23 June
0750
17.2 26.7   9.5 10.30 108.4 Oriented; Adara
4H
23 June
0845
26.7 36.2   9.5 10.00 105.3 Oriented
5H
23 June
0930
36.2 45.7   9.5 10.18 107.2 Oriented
6H
23 June
1020
45.7 55.2   9.5 10.08 106.1 Oriented; Adara
7H
23 June
1105
55.2 64.7   9.5 10.15 106.8 Oriented
8H
23 June
1155
64.7 74.2   9.5 9.80 103.2 Oriented
9H
23 June
1235
74.2 83.7   9.5 10.38 109.3 Oriented; Adara
10H
23 June
1325
83.7 93.2   9.5 10.44 109.9 Oriented, but liner shattered
11H
23 June
1405
93.2 102.7   9.5 9.65 101.6 Oriented, but liner shattered
12H
23 June
1450
102.7 112.2   9.5 9.50 100.0 Oriented
13X
23 June
1555
112.2 116.4   4.2 5.22 124.3
14X
23 June
1735
116.4 126.0   9.6 8.36 87.1 DVTP
15X
23 June
1820
126.0 135.6   9.6 4.23 44.1
16X
23 June
1905
135.6 145.2   9.6 4.00 41.7
17X
23 June
1955
145.2 154.8   9.6 9.38 97.7
18X
23 June
2035
154.8 164.4   9.6 7.36 76.7
19X
23 June
2215
164.4 174.0   9.6 0.00 0.0 DVTP; no recovery
20X
23 June
2255
174.0 183.6   9.6 0.01 0.1
21X
23 June
2350
183.6 193.3   9.7 8.46 87.2
22X
24 June
0025
193.3 202.9   9.6 9.69 100.9
23X
24 June
0120
202.9 212.5   9.6 9.99 104.1
24X
24 June
0205
212.5 222.2   9.7 0.77 7.9
25X
24 June
0300
222.2 231.9   9.7 9.99 103.0
26X
24 June
0345
231.9 241.5   9.6 7.70 80.2
27X
24 June
0435
241.5 251.2   9.7 9.71 100.1
28X
24 June
0525
251.2 260.8   9.6 9.18 95.6
29X
24 June
0615
260.8 270.4   9.6 8.59 89.5
30X
24 June
0705
270.4 280.1   9.7 9.76 100.6
31X
24 June
0755
280.1 289.7   9.6 9.75 101.6
32X
24 June
0840
289.7 299.4   9.7 9.18 94.6
33X
24 June
0930
299.4 309.1   9.7 6.22 64.1
34X
24 June
1025
309.1 318.7   9.6 9.89 103.0
35X
24 June
1115
318.7 328.4   9.7 10.20 105.2
36X
24 June
1210
328.4 338.0   9.6 10.09 105.1
37X
24 June
1300
338.0 347.6   9.6 9.42 98.1
38X
24 June
1345
347.6 357.2   9.6 9.84 102.5
39X
24 June
1430
357.2 366.8   9.6 9.83 102.4
40X
24 June
1520
366.8 376.4   9.6 9.66 100.6
41X
24 June
1610
376.4 386.0   9.6 2.26 23.5
42X
24 June
1710
386.0 395.6   9.6 9.67 100.7
43X
24 June
1805
395.6 405.2   9.6 9.73 101.4
44X
24 June
1850
405.2 414.8   9.6 9.32 97.1
45X
24 June
1935
414.8 424.4   9.6 9.56 99.6
46X
24 June
2025
424.4 434.1   9.7 4.46 46.0
47X
24 June
2130
434.1 443.7   9.6 9.61 100.1
48X
24 June
2235
443.7 453.3   9.6 9.68 100.8
49X
24 June
2345
453.3 462.9   9.6 9.89 103.0
50X
25 June
0105
462.9 472.6   9.7 0.14 1.4
51X
25 June
0210
472.6 482.3   9.7 8.03 82.8
52X
25 June
0310
482.3 492.0   9.7 0.25 2.6
53X
25 June
0430
492.0 501.7   9.7 0.30 3.1
54X
25 June
0535
501.7 511.3   9.6 9.79 102.0
55X
25 June
0640
511.3 520.9   9.6 9.55 99.5
56X
25 June
0745
520.9 530.6   9.7 6.64 68.5
57X
25 June
0840
530.6 540.3   9.7 1.12 11.6
58X
25 June
0945
540.3 549.9   9.6 0.25 2.6
59X
25 June
1050
549.9 559.5   9.6 0.00 0.0
60X
25 June
1210
559.5 569.1   9.6 4.27 44.5
61X
25 June
1310
569.1 578.7   9.6 2.53 26.4
62X
25 June
1420
578.7 588.4   9.7 9.82 101.2
63X
25 June
1555
588.4 598.0   9.6 1.54 16.0
64X
25 June
1725
598.0 607.7   9.7 3.38 34.9
65X
25 June
1850
607.7 617.3   9.6 2.29 23.9
66X
25 June
2015
617.3 626.9   9.6 9.80 102.1
67X
25 June
2150
626.9 636.5   9.6 9.88 102.92
68X
25 June
2310
636.5 645.8   9.3 9.21 99.0
69X
26 June
0050
645.8 655.4   9.6 9.74 101.5
70X
26 June
0225
655.4 664.8   9.4 7.81 83.1
71X
26 June
0355
664.8 674.4   9.6 9.71 101.2
72X
26 June
0530
674.4 684.0   9.6 9.88 102.9
73X
26 June
0650
684.0 693.7   9.7 2.60 26.8
74X
26 June
0815
693.7 703.3   9.6 9.19 95.7
75X
26 June
0945
703.3 713.0   9.7 9.87 101.8
76X
26 June
1130
713.0 722.6   9.6 9.90 103.1
Totals:


      722.6 566.40 78.4
186-1150B-

           



*****Drilled from 0 to 703.3 mbsf*****
 
1R
28 June
0420
703.3 709.7   6.4 4.91 76.7
2R
28 June
0535
709.7 719.3   9.6 2.26 23.5
3R
28 June
0655
719.3 729.0   9.7 0.83 8.6
4R
28 June
0810
729.0 738.6   9.6 3.50 36.5
5R
28 June
0925
738.6 748.3   9.7 1.49 15.4
6R
28 June
1040
748.3 757.9   9.6 8.26 86.0
7R
28 June
1150
757.9 767.6   9.7 1.45 15.0
8R
28 June
1300
767.6 777.2   9.6 2.48 25.8
9R
28 June
1415
777.2 786.9   9.7 4.30 44.3
10R
28 June
1525
786.9 796.5   9.6 4.14 43.1
11R
28 June
1640
796.5 806.1   9.6 6.35 66.2
12R
28 June
1805
806.1 815.7   9.6 5.86 61.0
13R
28 June
1915
815.7 825.4   9.7 4.11 42.4
14R
28 June
2040
825.4 835.0   9.6 5.11 53.2
15R
28 June
2155
835.0 844.6   9.6 2.20 22.9
16R
28 June
2320
844.6 854.2   9.6 7.65 79.7
17R
29 June
0050
854.2 863.8   9.6 5.36 55.8
18R
29 June
0220
863.8 873.5   9.7 4.31 44.4
19R
29 June
0340
873.5 883.2   9.7 4.05 41.8
20R
29 June
0505
883.2 892.9   9.7 9.84 101.4
21R
29 June
0625
892.9 902.1   9.2 5.44 59.1
22R
29 June
0745
902.1 911.8   9.7 8.59 88.6
23R
29 June
0855
911.8 921.5   9.7 7.96 82.1
24R
29 June
1010
921.5 931.1   9.6 1.99 20.7
25R
29 June
1135
931.1 940.7   9.6 7.98 83.1
26R
29 June
1250
940.7 950.3   9.6 7.31 76.2
27R
29 June
1410
950.3 959.9   9.6 7.03 74.3
28R
29 June
1525
959.9 969.5   9.6 8.96 93.3
29R
29 June
1650
969.5 979.1   9.6 8.56 89.2
30R
29 June
1820
979.1 988.7   9.6 8.78 91.5
31R
29 June
1940
988.7 998.3   9.6 3.66 38.1
32R
29 June
2050
998.3 1007.9   9.6 9.55 99.5
33R
29 June
2200
1007.9 1017.5   9.6 1.60 16.7
34R
29 June
2320
1017.5 1027.1   9.6 2.52 26.3
35R
30 June
0040
1027.1 1036.7   9.6 4.43 46.2
36R
30 June
0200
1036.7 1046.5   9.8 8.06 82.2
37R
30 June
0325
1046.5 1056.3   9.8 4.04 41.2
38R
30 June
0450
1056.3 1066.0   9.7 2.42 25.0
39R
30 June
0620
1066.0 1075.7   9.7 4.82 49.7
40R
30 June
0805
1075.7 1085.3   9.6 3.53 36.8
41R
30 June
0930
1085.3 1094.9   9.6 9.19 95.7
42R
30 June
1110
1094.9 1104.6   9.7 8.99 92.7
43R
30 June
1245
1104.6 1114.2   9.6 6.71 69.9
44R
30 June
1420
1114.2 1123.9   9.7 1.59 16.4
45R
30 June
1605
1123.9 1133.5   9.6 5.98 62.3
46R
30 June
1740
1133.5 1143.1   9.6 5.47 57.0
47R
30 June
1930
1143.1 1152.8   9.7 4.30 44.3
48R
30 June
2110
1152.8 1162.4   9.6 4.96 51.7
49R
30 June
2255
1162.4 1172.0   9.6 8.19 85.3
50R
01 July
0035
1172.0 1181.6   9.6 8.25 85.9
Coring totals:

      478.3 269.29 56.3
Drilled total:

      703.3    
Total:


      1181.6    

Notes: Adara = Adara temperature tool, DVTP = Davis-Villinger temperature probe. This table is also available in ASCII format.