Table T1. Coring summary, Site 1153.
Hole 1153A |
|||||||||
---|---|---|---|---|---|---|---|---|---|
Latitude: 41°16.2914´S |
|||||||||
Longitude: 129°48.9085´E |
|||||||||
Time on hole: 1200 hr, 29 Nov 99-1900 hr, 1 Dec 99 (55.0 hr) |
|||||||||
Time on site: 1200 hr, 29 Nov 99-1900 hr, 1 Dec 99 (55.0 hr) |
|||||||||
Seafloor (drill-pipe measurement from rig floor, mbrf): 5592.4 |
|||||||||
Distance between rig floor and sea level (m): 11.0 |
|||||||||
Water depth (drill-pipe measurement from sea level, m): 5581.4 |
|||||||||
Total depth (from rig floor, mbrf): 5867.3 |
|||||||||
Total penetration (mbsf): 274.9 |
|||||||||
Total length of cored section (m): 7.3 |
|||||||||
Drilled interval (m): 267.4 |
|||||||||
Total core recovered (m): 1.77 |
|||||||||
Core recovery (%): 24.2 |
|||||||||
Total number of cores: 8 |
|||||||||
Number of drilled cores: 7 |
|||||||||
Core | Date (1999) |
Ship local time |
Depth (mbsf) | Length (m) | Recovery (%) |
Comment | |||
Top | Bottom | Cored | Recovered | ||||||
187-1153A- | |||||||||
1W | 30 Nov | 0100 | 0.0 | 26.9 | 26.9 | 0.00 | N/A | ||
2W | 30 Nov | 0545 | 26.9 | 142.3 | 115.4 | 1.33 | N/A | ||
3W | 30 Nov | 0745 | 142.3 | 151.9 | 9.6 | 4.72 | N/A | Deployed Whirl-Pak on Core 3W | |
4W | 30 Nov | 1225 | 151.9 | 209.6 | 57.7 | 2.69 | N/A | ||
5W | 30 Nov | 1600 | 209.6 | 233.4 | 23.8 | 4.35 | N/A | ||
6W | 30 Nov | 1930 | 233.4 | 243.0 | 9.6 | 2.81 | N/A | Deployed Whirl-Pak on Core 6W | |
7W | 1 Dec | 0500 | 243.0 | 267.6 | 24.6 | 4.53 | N/A | First 23 cm curated as sediment. The rest of section curated as hard rock with Piece 1 beginning at 23 cm | |
8R | 1 Dec | 0915 | 267.6 | 274.9 | 7.3 | 1.77 | 24.2 | Deployed Whirl-Pak on Core 8R | |
Cored: | 7.3 | 1.77 | 24.2 | ||||||
Drilled: | 267.6 | ||||||||
Total: | 274.9 |
Notes: N/A = not applicable. This table is also available in ASCII format.