Table
T1. Coring
summary, Site 1154.
Hole
1154A
|
Latitude:
41°28.6695´S
|
Longitude:131°19.0354´E
|
Time
on hole: 0325 hr, 2 Dec 99-2130 hr, 4 Dec 99 (66.08 hr)
|
Time
on site: 0325 hr, 2 Dec 99-2130 hr, 4 Dec 99 (66.08 hr)
|
Seafloor
(drill-pipe measurement from rig floor, mbrf): 5747.4
|
Distance
between rig floor and sea level (m): 11.0
|
Water
depth (drill-pipe measurement from sea level, m): 5736.4
|
Total
depth (from rig floor, mbrf): 6015.0
|
Total
penetration (mbsf): 267.6
|
Total
length of cored section (m): 34.4
|
Total
core recovered (m): 9.42
|
Core
recovery (%): 27.4
|
Total
number of cores: 9
|
Number
of drilled cores: 1
|
|
|
|
|
|
|
|
|
|
|
Core |
Date
(Dec 1999) |
Ship
local time |
Depth
(mbsf) |
|
Length
(m) |
Recovery
(%) |
Comment |
Top |
Bottom |
|
Cored |
Recovered |
187-1154A- |
|
|
|
|
|
|
|
|
|
1W |
3 |
0100 |
0.0 |
233.2 |
|
233.2 |
2.49 |
N/A |
|
2R |
3 |
0430 |
233.2 |
237.2 |
|
4.0 |
0.73 |
18.3 |
|
3R |
3 |
0810 |
237.2 |
241.7 |
|
4.5 |
1.70 |
37.8 |
Deployed
Whirl-Pak on Core 3R |
4R |
3 |
1305 |
241.7 |
246.7 |
|
5.0 |
1.80 |
36.0 |
|
5R |
3 |
1920 |
246.7 |
251.3 |
|
4.6 |
0.99 |
21.5 |
|
6R |
3 |
2250 |
251.3 |
256.5 |
|
5.2 |
0.85 |
16.3 |
Deployed
Whirl-Pak on Core 6R |
7R |
4 |
0405 |
256.5 |
261.2 |
|
4.7 |
1.21 |
25.7 |
|
8R |
4 |
0815 |
261.2 |
265.8 |
|
4.6 |
1.69 |
36.7 |
|
9R |
4 |
1110 |
265.8 |
267.6 |
|
1.8 |
0.45 |
25.0 |
Deployed
Whirl-Pak on Core 9R |
|
|
|
|
Cored: |
|
34.4 |
9.42 |
27.4 |
|
|
|
|
|
Drilled: |
|
233.2 |
|
|
|
|
|
|
|
Total: |
|
267.6 |
|
|
|
Notes: N/A = not
applicable. This table is also available in ASCII
format.