Table T1. Coring summary, Site 1158.
Hole 1158A |
|||||||||
---|---|---|---|---|---|---|---|---|---|
Latitude: 43°56.8970´S |
|||||||||
Longitude: 1128°49.6959´E |
|||||||||
Time on hole: 1715 hr, 15 Dec 99-1330 hr, 16 Dec 99 (20.25 hr) |
|||||||||
Time on site: 1715 hr, 15 Dec 99-2330 hr, 17 Dec 99 (54.25 hr) |
|||||||||
Seafloor (drill-pipe measurement from rig floor, mbrf): 5178.4 |
|||||||||
Distance between rig floor and sea level (m): 11.1 |
|||||||||
Water depth (drill-pipe measurement from sea level, m): 5167.3 |
|||||||||
Total depth (from rig floor, mbrf): 5391.7 |
|||||||||
Total penetration (mbsf): 213.3 |
|||||||||
Total length of cored section (m): 14.4 |
|||||||||
Total length of drilled intervals (m): 198.9 |
|||||||||
Total core recovered (m): 0.85 |
|||||||||
Core recovery (%): 5.9 |
|||||||||
Total number of cores: 2 |
|||||||||
Total number of drilled cores: 1 |
|||||||||
Hole 1158B |
|||||||||
Latitude: 43°56.7837´S |
|||||||||
Longitude: 1128°49.7074´E |
|||||||||
Time on hole: 1330 hr, 16 Dec 99-0645 hr, 17 Dec 99 (16.25 hr) |
|||||||||
Seafloor (drill-pipe measurement from rig floor, mbrf): 5178.4 |
|||||||||
Distance between rig floor and sea level (m): 11.1 |
|||||||||
Water depth (drill-pipe measurement from sea level, m): 5167.3 |
|||||||||
Total depth (from rig floor, mbrf): 5319.6 |
|||||||||
Total penetration (mbsf): 141.2 |
|||||||||
Total length of cored section (m): 15.0 |
|||||||||
Total length of drilled intervals (m): 126.2 |
|||||||||
Total core recovered (m): 1.6 |
|||||||||
Core recovery (%): 10.7 |
|||||||||
Total number of cores: 3 |
|||||||||
Total number of drilled cores: 1 |
|||||||||
Hole 1158C |
|||||||||
Latitude: 43°56.6782´S |
|||||||||
Longitude: 1128°49.7127´E |
|||||||||
Time on hole: 0545 hr, 17 Dec 99-2230 hr, 17 Dec 99 (17.75 hr) |
|||||||||
Seafloor (drill-pipe measurement from rig floor, mbrf): 5178.4 |
|||||||||
Distance between rig floor and sea level (m): 11.1 |
|||||||||
Water depth (drill-pipe measurement from sea level, m): 5167.3 |
|||||||||
Total depth (from rig floor, mbrf): 5295.8 |
|||||||||
Total penetration (mbsf): 117.4 |
|||||||||
Total length of cored section (m): 9.4 |
|||||||||
Total length of drilled intervals (m): 108.0 |
|||||||||
Total core recovered (m): 1.61 |
|||||||||
Core recovery (%): 17.1 |
|||||||||
Total number of cores: 1 |
|||||||||
Total number of drilled cores: 1 |
|||||||||
Core | Date (Dec 1999) |
Ship local time |
Depth (mbsf) | Length (m) | Recovery (%) |
Comment | |||
Top
|
Bottom
|
Cored
|
Recovered
|
||||||
187-1158A- | |||||||||
1W | 16 | 0815 | 0.0 | 198.9 | 198.9 | 1.91 | N/A | ||
2R | 16 | 1015 | 198.9 | 203.9 | 5.0 | 0.46 | 9.2 | Whirl-Pak | |
3R | 16 | 1215 | 203.9 | 213.3 | 9.4 | 0.39 | 4.1 | ||
Cored: | 14.4 | 0.85 | 5.9 | ||||||
Drilled: | 198.9 | ||||||||
Total: | 213.3 | ||||||||
187-1158B- | |||||||||
1W | 16 | 1900 | 0.0 | 126.2 | 126.2 | 1.56 | N/A | ||
2R | 16 | 2250 | 126.2 | 131.8 | 5.6 | 0.57 | 10.2 | Whirl-Pak | |
3R | 16 | 0210 | 131.8 | 136.8 | 5.0 | 0.18 | 3.6 | ||
4R | 16 | 0445 | 136.8 | 141.2 | 4.4 | 0.85 | 19.3 | ||
Cored: | 15.0 | 1.60 | 10.7 | ||||||
Drilled: | 126.2 | ||||||||
Total: | 141.2 | ||||||||
187-1158C- | |||||||||
1W | 17 | 1050 | 0.0 | 108.0 | 108.0 | 0.16 | N/A | ||
2R | 17 | 1315 | 108.0 | 117.4 | 9.4 | 1.61 | 17.1 | Whirl-Pak | |
Cored: | 9.4 | 1.61 | 17.1 | ||||||
Drilled: | 108.0 | ||||||||
Total: | 117.4 |
Notes: N/A = not applicable. This table is also available in ASCII format.