Table T1. Coring summary, Site 1159.
Hole 1159A |
|||||||||
---|---|---|---|---|---|---|---|---|---|
Latitude: 45°57.4021´S |
|||||||||
Longitude: 129°59.9940´E |
|||||||||
Time on hole: 2215 hr, 18 Dec 99-2000 hr, 20 Dec 99 (45.75 hr) |
|||||||||
Time on site: 2215 hr, 18 Dec 99-2000 hr, 20 Dec 99 (45.75 hr) |
|||||||||
Seafloor (drill-pipe measurement from rig floor, mbrf): 4515.4 |
|||||||||
Distance between rig floor and sea level (m): 11.2 |
|||||||||
Water depth (drill-pipe measurement from sea level, m): 4504.2 |
|||||||||
Total depth (from rig floor, mbrf): 4688.7 |
|||||||||
Total penetration (mbsf): 173.3 |
|||||||||
Total length of cored section (m): 27.7 |
|||||||||
Total length of drilled intervals (m): 173.3 |
|||||||||
Total core recovered (m): 7.96 |
|||||||||
Core recovery (%): 28.7 |
|||||||||
Total number of cores: 6 |
|||||||||
Total number of drilled cores: 1 |
|||||||||
Total number of ghost cores: 1 |
|||||||||
Core | Date (Dec 1999) |
Ship local time |
Depth (mbsf) | Length (m) | Recovery (%) |
Comment | |||
Top
|
Bottom
|
Cored
|
Recovered
|
||||||
187-1159A- | |||||||||
1W | 19 | 1100 | 0.0 | 145.6 | 145.6 | 4.54 | N/A | ||
2R | 19 | 1350 | 145.6 | 148.6 | 3.0 | 0.97 | 32.3 | Whirl-Pak | |
3R | 19 | 1745 | 148.6 | 152.8 | 4.2 | 1.15 | 27.4 | ||
4R | 19 | 2225 | 152.8 | 157.3 | 4.5 | 0.85 | 18.9 | ||
5R | 20 | 0200 | 157.3 | 161.6 | 4.3 | 1.88 | 43.7 | ||
6R | 20 | 0430 | 161.6 | 166.7 | 5.1 | 1.70 | 33.3 | ||
7R | 20 | 0755 | 166.7 | 173.3 | 6.6 | 1.41 | 21.4 | ||
8G | 20 | 1030 | 173.3 | 173.3 | 0.0 | (0.24) | N/A | Ghost core | |
Cored: | 27.7 | 7.96 | 28.7 | ||||||
Drilled: | 145.6 | ||||||||
Total: | 173.3 |
Notes: Parentheses indicate material recovered without additional penetration (not included in recovery calculations). N/A = not applicable. This table is also available in ASCII format.