Table T1. Coring summary, Site 1161.

Hole 1161A
Latitude: 44°17.1958´S
Longitude: 129°3.0767´E
Time on hole: 1530 hr, 25 Dec 99-1315 hr, 26 Dec 99 (21.75 hr)
Time on site: 1530 hr, 25 Dec 99-0930 hr, 27 Dec 99 (42.25 hr)
Seafloor (drill-pipe measurement from rig floor, mbrf): 5031.4
Distance between rig floor and sea level (m): 11.3
Water depth (drill-pipe measurement from sea level, m): 5020.1
Total depth (from rig floor, mbrf): 176.7
Total penetration (mbsf): 145.3
Total length of cored section (m): 29.3
Total length of drilled intervals (m): 116.0
Total core recovered (m): 4.39
Core recovery (%): 15.0
Total number of cores: 4
Total number of drilled cores: 1

Hole 1161B
Latitude: 44°17.0761´S
Longitude: 129°3.0754´E
Time on hole: 1315 hr, 26 Dec 99-0930 hr, 27 Dec 99 (20.25 hr)
Seafloor (drill-pipe measurement from rig floor, mbrf): 5031.4
Distance between rig floor and sea level (m): 11.3
Water depth (drill-pipe measurement from sea level, m): 5020.1
Total depth (from rig floor, mbrf): 5198.4
Total penetration (mbsf): 167.0
Total length of cored section (m): 8.5
Total length of drilled intervals (m): 158.5
Total core recovered (m): 0.86
Core recovery (%): 10.1
Total number of cores: 2
Total number of drilled cores: 1
Core Date (Dec 1999) Ship
local time
Depth (mbsf)   Length (m) Recovery
(%)
Comment
Top Bottom Cored Recovered
187-1161A-








1W 26 0320 0.0 116.0
116.0 1.00 N/A
2R 26 0515 116.0 120.0
4.0 0.15 3.8 Whirl-Pak
3R 26 0720 120.0 129.4
9.4 1.75 18.6
4R 26 0955 129.4 138.8
9.4 1.33 14.1
5R 26 1225 138.8 145.3
6.5 1.16 17.8




Cored:
29.3 4.39 15.0




Drilled:
116.0






Total:
145.3


187-1161B-








1W 26 1925 0.0 158.5
158.5 0.53 N/A
2R 26 2130 158.5 162.9
4.4 0.41 9.3 Whirl-Pak
3R 26 0000 162.9 167.0
4.1 0.45 11.0




Cored:
8.5 0.86 10.1




Drilled:
158.5






Total:
167.0


Notes: N/A = not applicable. This table is also available in ASCII format.