Table T1. Coring summary, Site 1163.
Hole 1163A |
|||||||||
---|---|---|---|---|---|---|---|---|---|
Latitude: 44°25.4756´S |
|||||||||
Longitude: 126°54.4978´E |
|||||||||
Time on hole: 0100 hr, 1 Jan 2000-0730 hr, 3 Jan 2000 (54.5 hr) |
|||||||||
Time on site: 0100 hr, 1 Jan 2000-0730 hr, 3 Jan 2000 (54.5 hr) |
|||||||||
Seafloor (drill-pipe measurement from rig floor, mbrf): 4365.4 |
|||||||||
Distance between rig floor and sea level (m): 11.4 |
|||||||||
Water depth (drill-pipe measurement from sea level, m): 4354.0 |
|||||||||
Total depth (from rig floor, mbrf): 4573.5 |
|||||||||
Total penetration (mbsf): 208.1 |
|||||||||
Total length of cored section (m): 47.1 |
|||||||||
Total length of drilled intervals (m): 161.0 |
|||||||||
Total core recovered (m): 15.7 |
|||||||||
Core recovery (%): 33.3 |
|||||||||
Total number of cores: 10 |
|||||||||
Total number of drilled cores: 1 |
|||||||||
Core | Date (Jan 2000) |
Ship local time |
Depth (mbsf) | Length (m) | Recovery (%) |
Comment | |||
Top | Bottom | Cored | Recovered | ||||||
187-1163A- | |||||||||
1W | 1 | 1515 | 0.0 | 161.0 | 161.0 | 2.09 | N/A | ||
2R | 1 | 1925 | 161.0 | 165.4 | 4.4 | 1.44 | 32.7 | Whirl-Pak | |
3R | 1 | 2240 | 165.4 | 171.4 | 6.0 | 1.59 | 26.5 | ||
4R | 2 | 0115 | 171.4 | 175.9 | 4.5 | 1.11 | 24.7 | ||
5R | 2 | 0355 | 175.9 | 180.8 | 4.9 | 1.37 | 28.0 | ||
6R | 2 | 0725 | 180.8 | 185.2 | 4.4 | 2.88 | 65.5 | ||
7R | 2 | 1015 | 185.2 | 189.9 | 4.7 | 2.03 | 43.2 | ||
8R | 2 | 1310 | 189.9 | 194.1 | 4.2 | 0.66 | 15.7 | ||
9R | 2 | 1555 | 194.1 | 199.1 | 5.0 | 1.67 | 33.4 | ||
10R | 2 | 1855 | 199.1 | 203.1 | 4.0 | 1.30 | 32.5 | ||
Cored: | 47.1 | 15.70 | 33.3 | ||||||
Drilled: | 161.0 | ||||||||
Total: | 208.1 |