Table T17. Logging operations summary, Hole 1165C.

Run 1
Run 2
Operations depth summary
Triple combo
(main)
FMS-sonic
(pass 1)
Comments
Water depth, seafloor or mudline:       Logging operations commenced at 0700 hr on 02/13/00. A total of 30 barrels of sepiolite was circulated; no KCl used. Sea state/heave: average 1.0-1.5 m; maximum 3.2 m.
Mudline (mbrf): driller's depth 3548.7
3548.7 Run into hole speed = 10,000 ft/hr.
Mudline (mbrf): logger's depth 3546.5

Triple combo uprun speed = 900 ft/hr.
Mudline (mbsl) 3537.6
3537.6 FMS-sonic uprun speed = 500 ft/hr.




Logging operations ceased at 0940 hr on 02/14/00.
Drill-pipe depth during logging:



Initial pipe depth (mbrf): driller's depth 3638.4
3724.6 Drill pipe initially set at 89.7 mbsf, then three stands of pipe were added to 175.9 mbsf to push through an obstruction.
Initial pipe depth (mbsf): using driller's depth 89.7
175.9
Final pipe depth (mbrf): driller's depth 3724.6
3724.6 Drill pipe remained in place at 175.9 mbsf throughout logging operations to prevent the possibility of the logging tools getting stuck on the uprun.
Final pipe depth (mbrf): depth from logs 3721
3721
Final pipe depth (mbsf): using driller's depth 175.9
175.9
Final pipe depth (mbsf): using logger's depth 174.5
174.5 Final pipe depth = initial log depth.
Sticking encountered during logging:



Depth of first bridge or ledge (mbrf; winch) 3666
3850 First ledge encountered at 119 mbsf, 20 m below the base of the pipe. Attempts to break through the obstruction failed, so the tool string was partially rigged down and three stands of drill pipe were added. Pipe remained in place at this depth throughout the logging operations.
Depth of first bridge or ledge (mbsf) 119
303
Depth of second bridge or ledge (mbrf; winch) 3742
4131
Depth of second bridge or ledge (mbsf) 195
584
Depth of third bridge or ledge (mbrf; winch) 3850


Depth of third bridge or ledge (mbsf) 303

Second and third ledges, encountered at 195 and 303 mbsf, posed no real threat to operations on either run.
Depth of fourth bridge or ledge (mbrf; winch) 4132


Depth of fourth bridge or ledge (mbsf) 585

A tight spot at 585 mbsf prevented run 2 from reaching bottom.
Final tool depth:



(mbrf; winch) 4542.5
4131.8 Triple combo reached bottom, but FMS-sonic was halted by an obstruction at 585 mbsf, where sticking was noted on first run.
(mbsf): using logger's depth 996.0
585.3
Total hole depth (m): 999.1
999.1
Length of logging run (m): 821.5
410.8

Note: FMS = Formation MicroScanner; mbrf = meters below rig floor; mbsl = meters below sea level.