Table T10. Logging operations summary, Hole 1166A.

Operations depth summary
Run 1
 
Run 2
 
Run 3
Comments
Triple combo
(Main)
GHMT-sonic
(Main and repeat)
FMS-NGT
(Passes 1 and 2)

 
      Logging operations commenced at 1600 hr on 2/20/00. Wiper trip, sepiolite was circulated; no KCl used. Sea state/heave: average 0.5 m; maximum 1.5 m.
Water depth, seafloor or mudline:




Mudline (mbrf): driller's depth 486.7
486.7
486.7 Run into hole speed = 7000 ft/hr.
Mudline (mbrf): logger's depth 480.0
480.0
480.0 Triple combo uprun speed = 900 ft/hr.
Mudline (mbsl) 475.4
475.4
475.4 GHMT-sonic uprun speed = 900 ft/hr; 1200 ft/hr.






FMS-NGT uprun speed = 1600 ft/hr; 1700 ft/hr.
Drill-pipe depth during logging:




Logging operations ceased at 0800 hr on 2/21/00.
Initial pipe depth (mbrf): driller's depth 527.9
527.9
527.9
Initial pipe depth (mbsf): using driller's depth 41.2
41.2
41.2
Final pipe depth (mbrf): driller's depth 513.0
513.0
513.0 Initial pipe depth was set at 41.2 mbsf, and pipe was pulled up to 30 mbsf during upruns to give greater coverage of the open hole.
Final pipe depth (mbrf): depth from logs 510.0
510.0
510.0
Final pipe depth (mbsf): using driller's depth 26.3
26.3
26.3
Final pipe depth (mbsf): using logger's depth 32.0
30.0
30.0 Final pipe depth = initial log depth.
Sticking encountered during logging:





Depth of first bridge or ledge (mbrf; winch)

650.0

No ledges or bridges encountered on first run into hole.
Depth of first bridge or ledge (mbsf)

170.0

Some sticking experienced at ~170 mbsf on repeat of run 2.
Final tool depth:





(mbrf; winch) 863.0
864.5
864.9
(mbsf): using logger's depth 383.0
384.5
384.9
Total hole depth (m): 381.3
381.3
381.3 All three runs (including both passes of runs 2 and 3) reached total depth, giving maximum open-hole coverage. The upper 40 m to the seafloor were successfully logged with LWD/MWD.
Length of logging run (m): 353.0
354.5
354.9

Note: GHMT = geological high-resolution magnetic tool; FMS = Formation MicroScanner; NGT = natural gamma-ray tool; mbrf = meters below rig floor; mbsl = meters below sea level; LWD = logging while drilling; MWD = measurement while drilling.