Table T12. Logging operations summary, Site 1167.

Operations depth summary
Run 1
LWD/MWD
Comments
Holes 1167A and 1167B Triple combo Power Pulse CDR Logging operations commenced at 1700 on 2/27/00. Wiper trip, sepiolite was circulated; no KCl used. Sea state/heave: average 2.5 m; maximum 4.5 m.
Water depth, seafloor or mudline:

Mudline (mbrf): driller's depth 1651.3
Run into hole speed = 7000 ft/hr.
Mudline (mbrf): logger's depth 1649.0 1652.0 Triple combo uprun speed = 500-900 ft/hr.
Mudline (mbsl) 1640.3 1641.0 LWD/MWD average rate of penetration = 20 m/hr (calculation includes time for making drill-pipe connections).
Drill-pipe depth during logging:

Logging operations ceased at 0930 on 2/29/00.
Initial pipe depth (mbrf): driller's depth 1738.3

Initial pipe depth (mbsf): using driller's depth 87.0
Initial pipe depth was set at 86.95 mbsf.
Final pipe depth (mbrf): driller's depth 1738.3 1913.1
Final pipe depth (mbrf): depth from logs 1734.0

Final pipe depth (mbsf): using driller's depth 87.0 262.1
Final pipe depth (mbsf): using logger's depth 85.0
Final pipe depth = initial log depth.
Sticking encountered during logging:


Depth of first bridge or ledge (mbrf; winch) 1740.0
Tool got stuck at a bridge only 12 m below the base of the pipe. Fluid was pumped downhole until pressure increased enough to release the tool.
Depth of first bridge or ledge (mbsf) 91.0

Depth of second bridge or ledge (mbrf; winch) 1800.0
A second bridge was encountered at 151 mbsf; the tool could not break through this obstruction.
Depth of second bridge or ledge (mbsf) 151.0

Final tool depth:


(mbrf; winch) 1800.0 1913.1
(mbsf): using logger's depth 151.0 261.1
Total hole depth (m): 447.5 261.1 Wireline logging failed to reach total cored depth; however, the upper 265 m was successfully logged with LWD/MWD.
Length of logging run (m): 66.0 261.1

Note: CDR = compensated dual resistivity tool; LWD = logging while drilling; MWD = measurement while drilling; mbrf = meters below rig floor; mbsl = meters below sea level.