Table T1. Coring summary, Site 1172.

Hole 1172A
Latitude: 43°57.5854´S
Longitude:149°55.6961´E
Time on site: 246.08 hr (0915 hr, 23 April-1520 hr, 3 May 2000)
Time on hole: 72.25 hr; 3 days, 15 min (0915 hr, 23 April-0930 hr, 26 April 2000)
Seafloor (drill pipe measurement from rig floor, mbrf): 2633.2
Distance between rig floor and sea level (m): 11.3
Water depth (drill pipe measurement from sea level, m): 2621.9
Total depth (from rig floor, mbrf): 3155.8
Total penetration (mbsf): 522.6
Total length of cored section (m): 522.6
Total core recovered (m): 483.72
Core recovery (%): 92.6
Total number of cores: 56
Hole 1172B
Latitude: 43°57.5750´S
Longitude: 149°55.7010´E
Time on hole: 24.75 hr; 1 day, 45 min (0930 hr, 26 April-1015 hr, 27 April 2000)
Seafloor (drill pipe measurement from rig floor, mbrf): 2633.6
Distance between rig floor and sea level (m): 11.3
Water depth (drill pipe measurement from sea level, m): 2622.0
Total depth (from rig floor, mbrf): 2836.0
Total penetration (mbsf): 202.4
Total length of cored section (m): 202.4
Total core recovered (m): 206.7
Core recovery (%): 102.1
Total number of cores: 22
Hole 1172C
Latitude: 43°57.5684´S
Longitude: 149°55.7077´E
Time on hole: 25.25 hr; 1 day, 1 hr, 15 min (1015 hr, 26 April-1130 hr, 28 April 2000)
Seafloor (drill pipe measurement from rig floor, mbrf): 2633.0
Distance between rig floor and sea level (m): 11.3
Water depth (drill pipe measurement from sea level, m): 2621.7
Total depth (from rig floor, mbrf): 2804.0
Total penetration (mbsf): 171.0
Total length of cored section (m): 171.0
Total core recovered (m): 172.64
Core recovery (%): 101.0
Total number of cores: 18
Hole 1172D
Latitude: 43°57.5545´S
Longitude: 149°55.7169´E
Time on hole: 123.83 hr; 5 days,3 hr, 50 min (1130 hr, 28 April-1520 hr, 3 May 2000)
Seafloor (drill pipe measurement from rig floor, mbrf): 2633.0
Distance between rig floor and sea level (m): 11.3
Water depth (drill pipe measurement from sea level, m): 2621.7
Total depth (from rig floor, mbrf): 3399.5
Total penetration (mbsf): 766.5
Total length of cored section (m): 297.9
Total length of drilled intervals (m): 468.6
Total core recovered (m): 237.09
Core recovery (%): 79.6
Total number of cores: 31
Total number of drilled intervals (DI): 2
 
Core Date
(2000)
Time
(local)
Depth (mbsf)   Length (m) Recovery
(%)
Top
Bottom
Cored
Recovered
189-1172A-







1H 23 April 1650 0.0 6.3
6.3 6.29 99.8
2H 23 April 1745 6.3 15.8
9.5 9.90 104.2
3H 23 April 1900 15.8 25.3
9.5 9.79 103.1
4H 23 April 1940 25.3 34.8
9.5 9.86 103.8
5H 23 April 2125 34.8 44.3
9.5 9.75 102.6
6H 23 April 2215 44.3 53.8
9.5 9.72 102.3
7H 23 April 2315 53.8 63.3
9.5 10.04 105.7
8H 24 April 0015 63.3 72.8
9.5 9.97 105.0
9H 24 April 0235 72.8 82.3
9.5 9.79 103.1
10H 24 April 0335 82.3 91.8
9.5 9.85 103.7
11H 24 April 0430 91.8 101.3
9.5 9.59 101.0
12H 24 April 0530 101.3 110.8
9.5 8.80 92.6
13H 24 April 0630 110.8 120.3
9.5 10.01 105.4
14H 24 April 0725 120.3 129.8
9.5 9.00 94.7
15H 24 April 0820 129.8 139.3
9.5 10.04 105.7
16H 24 April 1030 139.3 148.8
9.5 9.97 105.0
17H 24 April 1155 148.8 158.3
9.5 9.52 100.2
18H 24 April 1255 158.3 167.8
9.5 9.61 101.2
19H 24 April 1355 167.8 177.3
9.5 10.02 105.5
20H 24 April 1455 177.3 186.8
9.5 9.20 96.8
21H 24 April 1555 186.8 196.3
9.5 10.06 105.9
22H 24 April 1655 196.3 205.8
9.5 9.93 104.5
23H 24 April 1755 205.8 215.3
9.5 9.52 100.2
24H 24 April 1930 215.3 224.8
9.5 9.90 104.2
25X 24 April 2105 224.8 230.1
5.3 3.26 61.5
26X 24 April 2200 230.1 239.7
9.6 5.79 60.3
27X 24 April 2250 239.7 249.3
9.6 7.21 75.1
28X 24 April 2345 249.3 258.9
9.6 6.40 66.7
29X 25 April 0035 258.9 268.0
9.1 7.42 81.5
30X 25 April 0125 268.0 277.6
9.6 8.50 88.5
31X 25 April 0220 277.6 287.2
9.6 8.35 87.0
32X 25 April 0315 287.2 296.8
9.6 8.64 90.0
33X 25 April 0405 296.8 306.5
9.7 9.62 99.2
34X 25 April 0455 306.5 316.1
9.6 9.89 103.0
35X 25 April 0545 316.1 325.7
9.6 8.87 92.4
36X 25 April 0640 325.7 335.3
9.6 9.43 98.2
37X 25 April 0730 335.3 344.9
9.6 9.85 102.6
38X 25 April 0825 344.9 354.6
9.7 8.91 91.9
39X 25 April 0915 354.6 364.2
9.6 9.80 102.1
40X 25 April 1015 364.2 373.8
9.6 9.85 102.6
41X 25 April 1135 373.8 383.4
9.6 9.70 101.0
42X 25 April 1235 383.4 393.0
9.6 9.70 101.0
43X 25 April 1340 393.0 402.6
9.6 9.88 102.9
44X 25 April 1445 402.6 412.2
9.6 9.92 103.3
45X 25 April 1555 412.2 421.8
9.6 9.96 103.8
46X 25 April 1655 421.8 431.4
9.6 9.91 103.2
47X 25 April 1750 431.4 441.0
9.6 9.94 103.5
48X 25 April 1855 441.0 450.6
9.6 9.90 103.1
49X 25 April 2020 450.6 460.2
9.6 9.90 103.1
50X 25 April 2150 460.2 469.8
9.6 0.08 0.8
51X 25 April 2305 469.8 479.4
9.6 6.49 67.6
52X 26 April 0040 479.4 489.0
9.6 9.30 96.9
53X 26 April 0205 489.0 498.6
9.6 9.85 102.6
54X 26 April 0350 498.6 508.3
9.7 5.97 61.6
55X 26 April 0555 508.3 518.0
9.7 0.82 8.5
56X 26 April 0755 518.0 522.6
4.6 0.35 7.6




Totals:
522.6 483.72 92.6
189-1172B-







1H 26 April 1120 0.0 2.9
2.9 2.84 97.9
2H 26 April 1205 2.9 12.4
9.5 9.88 104.0
3H 26 April 1255 12.4 21.9
9.5 9.75 102.6
4H 26 April 1345 21.9 31.4
9.5 9.92 104.4
5H 26 April 1500 31.4 40.9
9.5 9.96 104.8
6H 26 April 1550 40.9 50.4
9.5 9.69 102.0
7H 26 April 1700 50.4 59.9
9.5 9.98 105.1
8H 26 April 1800 59.9 69.4
9.5 9.93 104.5
9H 26 April 1900 69.4 78.9
9.5 9.85 103.7
10H 26 April 2005 78.9 88.4
9.5 10.20 107.4
11H 26 April 2100 88.4 97.9
9.5 9.71 102.2
12H 26 April 2155 97.9 107.4
9.5 10.10 106.3
13H 26 April 2255 107.4 116.9
9.5 9.17 96.5
14H 26 April 2355 116.9 126.4
9.5 9.61 101.2
15H 27 April 0100 126.4 135.9
9.5 9.76 102.7
16H 27 April 0210 135.9 145.4
9.5 9.97 105.0
17H 27 April 0310 145.4 154.9
9.5 8.97 94.4
18H 27 April 0415 154.9 164.4
9.5 9.27 97.6
19H 27 April 0520 164.4 173.9
9.5 9.68 101.9
20H 27 April 0620 173.9 183.4
9.5 9.28 97.7
21H 27 April 0725 183.4 192.9
9.5 9.29 97.8
22H 27 April 0850 192.9 202.4
9.5 9.89 104.1




Totals:
202.4 206.70 102.1
189-1172C-







1H 27 April 1200 0.0 9.5
9.5 9.55 100.5
2H 27 April 1245 9.5 19.0
9.5 9.61 101.2
3H 27 April 1340 19.0 28.5
9.5 9.45 99.5
4H 27 April 1430 28.5 38.0
9.5 9.54 99.4
5H 27 April 1510 38.0 47.5
9.5 9.41 99.1
6H 27 April 1600 47.5 57.0
9.5 9.49 99.9
7H 27 April 1655 57.0 66.5
9.5 9.20 96.8
8H 27 April 1745 66.5 76.0
9.5 9.77 102.8
9H 27 April 1835 76.0 85.5
9.5 9.86 103.8
10H 27 April 1935 85.5 95.0
9.5 9.01 94.8
11H 27 April 2025 95.0 104.5
9.5 9.95 104.7
12H 27 April 2120 104.5 114.0
9.5 10.04 105.7
13H 27 April 2215 114.0 123.5
9.5 9.87 103.9
14H 27 April 2310 123.5 133.0
9.5 9.67 101.8
15H 28 April 0005 133.0 142.5
9.5 9.01 94.8
16H 28 April 0105 142.5 152.0
9.5 9.85 103.7
17H 28 April 0220 152.0 161.5
9.5 9.44 99.4
18H 28 April 0400 161.5 171.0
9.5 9.92 104.4




Totals:
171 172.64 101.0
189-1172D-







Drilled

0.0 343.6



1R 29 April 0430 343.6 353.2
9.6 0.00 0.0
2R 29 April 0555 353.2 362.8
9.6 9.82 102.3
3R 29 April 0710 362.8 372.4
9.6 9.89 103.0
Drilled

372.4 497.4



4R 29 April 1500 497.4 507.0
9.6 8.03 83.7
5R 29 April 1730 507.0 516.6
9.6 6.02 62.7
6R 29 April 2000 516.6 526.2
9.6 6.11 63.7
7R 29 April 2225 526.2 535.8
9.6 9.10 94.8
8R 30 April 0020 535.8 545.4
9.6 8.24 85.8
9R 30 April 0210 545.4 555.1
9.7 9.93 102.4
10R 30 April 0350 555.1 564.7
9.6 9.27 96.6
11R 30 April 0540 564.7 574.3
9.6 8.91 92.8
12R 30 April 0730 574.3 583.9
9.6 10.02 104.4
13R 30 April 0920 583.9 593.5
9.6 9.78 101.9
14R 30 April 1100 593.5 603.1
9.6 8.42 87.7
15R 30 April 1305 603.1 612.7
9.6 9.90 103.1
16R 30 April 1505 612.7 622.3
9.6 6.38 66.5
17R 30 April 1700 622.3 631.9
9.6 9.96 103.8
18R 30 April 1905 631.9 641.5
9.6 7.68 80.0
19R 30 April 2120 641.5 651.1
9.6 4.46 46.5
20R 30 April 2330 651.1 660.7
9.6 9.80 102.1
21R 1 May 0125 660.7 670.3
9.6 6.56 68.3
22R 1 May 0350 670.3 680.0
9.7 2.79 28.8
23R 1 May 0545 680.0 689.7
9.7 2.11 21.8
24R 1 May 0730 689.7 699.3
9.6 9.38 97.7
25R 1 May 0910 699.3 708.9
9.6 9.93 103.4
26R 1 May 1145 708.9 718.5
9.6 8.52 88.8
27R 1 May 1345 718.5 728.1
9.6 9.77 101.8
28R 1 May 1535 728.1 737.7
9.6 9.15 95.3
29R 1 May 1800 737.7 747.3
9.6 7.76 80.8
30R 1 May 1945 747.3 756.9
9.6 0.11 1.2
31R 1 May 2215 756.9 766.5
9.6 9.29 96.8




Coring totals:
297.9 237.09 79.6




Drilled totals:
468.6





Totals:
766.5