Table T1. Coring summary, Site 1174.

Core Date
(June
2000)
Time
(local)
Depth (mbsf)   Length (m)   Recovery (%) Comments
Top
Bottom
Cored
Recovered
190-1174A-








1H 7 1800 0.0 4.4
4.4 4.40
100.0
2H 7 1925 4.4 13.9
9.5 9.59
100.9
3H 7 2040 13.9 23.4
9.5 8.44
88.8 Tensor at 19:20. Expanding core: gassy voids throughout
4H 7 2225 23.4 32.9
9.5 7.38
77.7
5H 7 2340 32.9 42.4
9.5 7.43
78.2
6H 8 0100 42.4 51.9
9.5 0.00
0.0 Whirl-Pak, tracer
7H 8 0220 51.9 61.4
9.5 3.59
37.8 Whirl-Pak, tracer
8H 8 0415 61.4 64.4
3.0 6.21
207.0 DVTP at 4826.9 m
9X 9 0045 64.4 74.1
9.7 0.00
0.0 Core barrel jammed; end hole




Totals: 74.1 47.04
63.4
190-1174B-








10 10 1830 0.0 143.7
0.0 0.00
N/A Drill-in casing to 4906.17 m
1R 12 0730 143.7 150.1
6.4 9.62
150.3 AHC on
2R 12 1005 150.1 159.7
9.6 0.60
6.2 Run DVPT sample at 4922.17 m; AHC on
3R 12 1415 159.7 169.4
9.7 2.39
24.6 AHC on
4R 12 1630 169.4 179.0
9.6 2.31
24.1 Whirl-Pak, tracer, AHC on
5R 12 1820 179.0 188.7
9.7 1.97
20.3 Whirl-Pak, tracer, AHC on
6R 12 1945 188.7 198.4
9.7 2.39
24.6 AHC on
7R 12 2130 198.4 208.0
9.6 1.47
15.3 DVTP at 4970.5 m; AHC on
8R 13 0030 208.0 217.7
9.7 0.95
9.8 AHC on
9R 13 0210 217.7 227.2
9.5 2.79
29.4 AHC on
10R 13 0400 227.2 236.8
9.6 2.30
24.0 AHC on
11R 13 0520 236.8 246.5
9.7 2.53
26.1 AHC on
12R 13 0705 246.5 256.2
9.7 1.74
17.9 AHC on
13R 13 0900 256.2 265.8
9.6 3.69
38.4 AHC on
14R 13 1710 265.8 275.5
9.7 0.50
5.2 AHC on
15R 13 1925 275.5 285.1
9.6 2.28
23.7 AHC on
16R 13 2130 285.1 294.6
9.5 1.80
18.9 AHC on
17R 13 2350 294.6 304.3
9.7 2.88
29.7 AHC on
18R 14 0205 304.3 314.0
9.7 6.17
63.6 AHC on
19R 14 0410 314.0 323.5
9.5 2.22
23.4 AHC on
20R 14 0625 323.5 333.1
9.6 3.89
40.5 AHC on
21R 14 0830 333.1 342.4
9.3 2.85
30.6 AHC on
22R 14 1045 342.4 352.0
9.6 1.34
14.0 AHC on
23R 14 1245 352.0 361.7
9.7 2.49
25.7 AHC on
24R 14 1455 361.7 371.3
9.6 4.72
49.2 AHC on
25R 14 1655 371.3 380.9
9.6 2.20
22.9 AHC on
26R 14 1910 380.9 390.5
9.6 0.84
8.7 AHC on
27R 14 2120 390.5 400.2
9.7 5.12
52.8 AHC on
28R 14 2345 400.2 409.8
9.6 2.32
24.2 AHC on
29R 15 200 409.8 419.4
9.6 4.94
51.5 AHC on
30R 15 415 419.4 429.0
9.6 0.18
1.9 AHC on
31R 15 630 429.0 438.6
9.6 4.62
48.1 Whirl-Pak, tracer, AHC on
32R 15 920 438.6 448.2
9.6 9.55
99.5 Whirl-Pak, tracer, AHC on
33R 15 1150 448.2 457.9
9.7 7.16
73.8 AHC on
34R 15 1420 457.9 467.1
9.2 7.25
78.8 AHC on
35R 15 1645 467.1 476.5
9.4 2.85
30.3 AHC on
36R 15 1850 476.5 485.7
9.2 7.49
81.4 AHC on
37R 15 2050 485.7 495.3
9.6 9.21
95.9 AHC on
38R 15 2310 495.3 504.9
9.6 9.73
101.4 AHC on
39R 16 0125 504.9 514.6
9.7 8.31
85.7 AHC on
40R 16 1305 514.6 524.3
9.7 9.21
94.9
41R 16 2200 524.3 533.9
9.6 4.89
50.9
42R 17 0105 533.9 543.6
9.7 9.76
100.6
43R 17 0315 543.6 552.9
9.3 9.13
98.2
44R 17 0525 552.9 562.6
9.7 5.79
59.7
45R 17 0715 562.6 572.3
9.7 5.75
59.3
46R 17 0920 572.3 581.9
9.6 9.44
98.3
47R 17 1115 581.9 591.6
9.7 8.79
90.6
48R 17 1325 591.6 601.2
9.6 9.98
104.0
49R 17 1510 601.2 610.9
9.7 4.14
42.7
50R 17 1705 610.9 620.5
9.6 7.19
74.9
51R 17 1850 620.5 630.1
9.6 3.85
40.1
52R 17 2045 630.1 639.8
9.7 9.31
96.0
53R 17 2230 639.8 649.4
9.6 5.90
61.5
54R 18 0030 649.4 659.0
9.6 9.84
102.5
55R 18 0230 659.0 668.7
9.7 9.08
93.6
56R 18 0435 668.7 678.3
9.6 2.91
30.3
57R 18 0640 678.3 688.0
9.7 9.93
102.4
58R 18 0845 688.0 697.6
9.6 6.44
67.1
59R 18 1050 697.6 707.2
9.6 8.85
92.2
60R 18 1250 707.2 716.9
9.7 8.61
88.8
61R 18 1455 716.9 726.5
9.6 9.91
103.2
62R 18 1640 726.5 736.1
9.6 7.18
74.8
63R 18 1835 736.1 745.7
9.6 9.97
103.9
64R 18 2040 745.7 755.0
9.3 7.42
79.8
65R 18 2230 755.0 764.6
9.6 9.93
103.4
66R 19 0030 764.6 774.2
9.6 7.17
74.7
67R 19 0240 774.2 783.9
9.7 9.96
102.7
68R 19 0445 783.9 793.6
9.7 3.74
38.6
69R 19 0650 793.6 803.3
9.7 9.89
102.0
70R 19 0900 803.3 812.5
9.2 7.82
85.0
71R 19 1135 812.5 822.2
9.7 2.99
30.8 Firm at 5578 m (815.5 mbsf)
72R 19 1415 822.2 831.8
9.6 5.05
52.6
73R 19 1645 831.8 841.4
9.6 9.88
102.9
74R 19 1840 841.4 851.0
9.6 3.89
40.5
75R 19 2025 851.0 860.7
9.7 1.91
19.7
76R 19 2240 860.7 870.4
9.7 2.77
28.6
77R 20 0025 870.4 880.0
9.6 8.22
85.6
78R 20 0235 880.0 889.3
9.3 7.13
76.7
79R 20 0450 889.3 899.0
9.7 4.38
45.2
80R 20 0645 899.0 908.6
9.6 8.60
89.6
81R 20 0830 908.6 918.3
9.7 7.90
81.4
82R 20 1010 918.3 927.9
9.6 4.16
43.3
83R 20 1220 927.9 937.5
9.6 9.93
103.4
84R 20 1415 937.5 947.1
9.6 9.05
94.3
85R 20 1605 947.1 956.8
9.7 8.83
91.0
86R 20 1800 956.8 966.5
9.7 8.99
92.7
87R 20 2010 966.5 976.1
9.6 7.30
76.0
88R 20 2210 976.1 985.3
9.2 5.87
63.8
89R 21 0010 985.3 994.9
9.6 9.88
102.9 AHC on
90R 21 0210 994.9 1004.6
9.7 3.06
31.5 AHC on
91R 21 0430 1004.6 1014.2
9.6 3.28
34.2 AHC on
92R 21 0640 1014.2 1023.9
9.7 8.20
84.5 AHC on
93R 21 0855 1023.9 1033.5
9.6 7.18
74.8 AHC on
94R 21 1135 1033.5 1043.1
9.6 7.43
77.4 AHC on
95R 21 1345 1043.1 1052.6
9.5 5.84
61.5 AHC on
96R 21 1540 1052.6 1062.3
9.7 6.03
62.2 AHC on
97R 21 1755 1062.3 1071.9
9.6 6.92
72.1 AHC on
98R 21 2010 1071.9 1081.5
9.6 5.37
55.9 AHC on
99R 21 2225 1081.5 1091.2
9.7 2.50
25.8 AHC on
100R 22 0045 1091.2 1100.8
9.6 2.77
28.9 AHC on
101R 22 0325 1100.8 1110.2
9.4 1.71
18.2
102R 22 0605 1110.2 1119.8
9.6 1.11
11.6



**** Drilled from 0 to 143.7 mbsf ****




Totals:
976.1 577.57
59.2

Note: DVTP = Davis-Villinger temperature probe, AHC = advanced hydraulic piston corer.