Leg 191 Initial Reports Supplementary Material Readme.txt Supplementary materials provided on the Leg 191 Initial Reports CD-ROM include a collection of photographs of the preparation, installation, and activation of the borehole seismological observatories. The photographs in Figures 1 through 24 show the different steps in the preparation and installation of the borehole seismometers in Hole 1179E. Figures 25 through 31 show the operations by KAIKO, a remotely operated vehicle designed by JAMSTEC, during the October-November 2000 cruise that activated the borehole broadband seismic observatory. Full-sized PDF or HTM photographs can be loaded by clicking on the thumbnail photo or on the figure link below the thumbnail photo. The full figure caption can be accessed by clicking on the caption link below the thumbnail photo.