Table T2. Extended operational summary, Leg 191.

Hole
Number of APC cores
Number of XCB cores
Number of RCB cores
Seafloor (mbrf)
Rig floor elevation (m)
Total penetration (mbrf)
Comments
1179A 1 0 0 5576.5 11.0 5586.5
1179B 6 0 0 5574.4 11.0 5629.5
1179C 24 3 0 5576.7 12.8 5869.6
1179D 0 0 22 5577.0 11.0 6052.0
1179E 0 0 0 5577.0 11.1 6052.0 Hole dedicated to seismometer package installation
Totals: 31 3 22 5576.3 11.4 5822.7
1180A 0 0 0 2157.0 11.5 2162.0 HRRS spud tests
1180B 0 0 0 2157.0 11.5 2165.0 HRRS spud tests
1180C 0 0 0 2132.0 11.5 2135.0 HRRS spud tests
Totals: 0 0 0 2148.7 11.5 2154.0
1181A 0 0 0 995.0 11.0 998.0 HRRS spud tests
1181B 0 0 0 981.0 11.6 984.0 HRRS spud tests
1181C 0 0 0 970.0 11.6 973.0 HRRS spud tests
Totals: 0 0 0 982.0 11.4 985.0
1182A 0 0 0 2878.0 11.7 2880.0 HRRS spud tests
1182B 0 0 0 2878.0 11.7 2879.5 HRRS spud tests
1182C 0 0 0 2877.0 11.7 2882.0 HRRS spud tests
1182D 0 0 0 2870.0 11.7 2873.0 HRRS spud tests
1182E 0 0 0 2872.0 11.7 2876.5 HRRS spud tests
1182F 0 0 0 2873.0 11.7 2876.8 HRRS spud tests
1182G 0 0 0 2873.0 11.7 2878.0 HRRS spud tests
Totals: 0 0 0 2874.4 11.7 2878.0

Note: APC = advanced hydraulic piston corer, XCB = extended core barrel, RCB = rotary core barrel, HRRS = hard-rock reentry system.