Figure F8. Installation of the borehole instrumentation assembly (BIA) in the moonpool area. After affixing the ocean borehole seismometer (OBH) sensors onto the BIA, the BIA was moved to the moonpool area for installation into the borehole. Cable connections to the OBH sensors were made.